My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This task includes the office processing of the collected survey data, data extraction, field <br /> booknote reductions, CADD drafting, and other duties required for the generation of the <br /> Understandings <br /> 1. Rights-of-Entry will be provided by the City of Everett. <br /> 2. Traffic control, if required, to be provided by others. <br /> 3. Measurement of tree driplines/canopies are not a part of the scope services. <br /> 4. Tree locations, other than within the laydown area, are not a part of the scope of <br /> services <br /> 5. Tree Tags are not a part of the scope of services. <br /> 6. Boundary and Right-of-Way resolution is not a part of the scope of services. <br /> 7. Setting of property corners is not a part of the scope of services. <br /> 8. A record of Survey is not a part of the scope of services. <br /> 9. Up to 40 Ordinary High-Water Mark flags, set by others, to be located. <br /> 10. Pipe invert elevations are not a part of the scope of services. <br /> 11. 1 Alliance will try to schedule the conductible utility locating service to be onsite <br /> within 5 business days from the notice to proceed. <br /> 12. 1 Alliance will not be responsible for the completeness or timeliness of the <br /> conductible utility locating service. <br /> Deliverables <br /> 1. Topographic Survey with 1-foot contour intervals(electronic copy). <br /> 2. AutoCAD Surfaces (DTM Files) (electronic copy). <br /> 3. Copy of field survey books (hard copy). <br /> 4. ASCII file of control points. <br /> Exhibit A—Survey limits <br /> O <br /> Ilittpmairr <br /> t t <br /> Maple Heights Bridge Seismic Retrofit <br />
The URL can be used to link to this page
Your browser does not support the video tag.