My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Typically, survey work shall reference the Washington State Plane Coordinate System of 1983 <br /> as established in accordance with Chapter 58.20 Revised Code of Washington. <br /> Vertical <br /> Typically, the Vertical Datum for the survey work shall reference the North American Vertical <br /> Datum of 1988 (NAVD88). <br /> Task 3.3 Field Surveying and Mapping <br /> This task includes the field surveying and mapping required for this specific effort. <br /> Topographic—approx. 670 linear feet along W. Mukilteo Blvd. The consultant shall locate and <br /> map visible features necessary for the creation of an engineering design base map as shown in <br /> Exhibit A. Typical features include: <br /> • Topographic and Planimetric, including channelization. <br /> • Edge of Pavement, gravel,grass, concrete, etc. <br /> • Curb and sidewalk, including curb cuts and ADA ramps. <br /> • Signs and signals. <br /> • Trees and edges of significant vegetation in the laydown area (see Exhibit A). <br /> • Walls, rockeries, and fences (or faces of). <br /> • Ground measurements will be captured sufficient to generate a digital terrain model <br /> (DTM) at one-foot contours. <br /> • Visible improvements situated within the described mapping limits. <br /> • Bridge abutment as-builts and soffit elevations. <br /> Task 3.4 Utility Surveying Services <br /> This task includes the mapping of utilities throughout the survey limits, including within the <br /> roadway. Underground 'Conductible' Utility Locates. The Consultant shall arrange for <br /> underground 'conductible' utility locating, by means of the Washington One Call ITIC program. <br /> This service shall locate utilities within the project corridor limits. The consultant will <br /> reasonably rely upon the accuracy,timeliness, and completeness of the information provided <br /> by the utility locating service. Franchise utilities are typically marked by the franchise. <br /> Underground utilities to be mapped include: power; natural gas; water; cable TV; telephone, <br /> and traffic. Fiber optic lines are typically marked in the field by the owner. <br /> 3.4.1. Surface Observable to include: power poles, vaults, risers, fire hydrants, water <br /> valves/meters, gas valves, traffic signal/traffic control boxes, and overhead utility lines. <br /> 3.4.2. Stormwater structures—The center of rims on catch basins and storm drain manholes <br /> will be collected. <br /> 3.4.3. Sanitary sewer structures—The center of rims on sewer manholes will be collected. <br /> 3.4.4. Office Processing <br /> Maple Heights Bridge Seismic Retrofit 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.