My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 6 Traffic Analysis <br /> Although permanent channelization and/or signalization changes are not anticipated as part <br /> of this project, the CONSULTANT shall prepare a Traffic Control Plans that will go together <br /> with the construction of the intended retrofit scheme and to ensure that mobility of traffic <br /> is not hindered.The exact limits of the traffic control will be determined jointly between the <br /> CITY and the CONSULTANT but are typically expected to extend to the next adjacent street <br /> intersection or 1/4-mile in each direction along the roadway, whichever is least. <br /> As part of the traffic analyses, there will be Neighborhood Traffic Analysis activities. As part <br /> of this activity, there will be data collection including vehicle, pedestrian and bike volumes, <br /> to provide a delay analysis and respond to neighborhood comments regarding the impacts <br /> of the construction on the travel near the construction zone, especially in the light of the <br /> signalized intersection to the north of the project site. <br /> Deliverables: <br /> • Draft Traffic Control Plans- PDF and 1 hardcopy <br /> • Final Traffic Control Plans- PDF and 1 hardcopy <br /> Maple Heights Bridge Seismic Retrofit 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.