My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vegetation areas that are assumed to be disturbed by the project near the bridge. Drawings <br /> will be prepared under the supervision of a WA Professional Landscape Architect and will be <br /> included in the PS&E set along with an opinion of construction cost. <br /> Assumptions: <br /> • The restoration drawings will address restoration of pre-project vegetation and soil <br /> conditions and will include information for seeding/mulching and native vegetation <br /> restoration: drawing plan sheets and legends, details, and general notes. <br /> • Restoration drawings may be included in the Critical Areas Report for restoration of <br /> temporary stream buffer impacts. <br /> • No park pavement or park structures will be disturbed or restored by the PROJECT. <br /> Deliverables: <br /> • Review final park restoration drawings and cost estimate provided at 90%and Final <br /> PSE. <br /> Task 5.6 NPDES Construction Stormwater General Permit (CSGP) <br /> The construction of the PROJECT is not expected to require an acre or more of cumulative land <br /> disturbance triggering CSGP Notice of Intent (NO1) submittal. However, submitting for permit <br /> coverage is advised since work will occur over Glenwood Creek and permit coverage could be <br /> required by ecology due to potential water quality risks to the stream. If no permit is obtained <br /> prior to construction, Ecology could require coverage during construction and cause <br /> construction delays. <br /> Assumptions: <br /> • The CONSULTANT will prepare and submit a NOI electronically after issuance of <br /> SEPA exemption or SEPA determination. <br /> • The CITY will be provided with applicant forms after submittal and will need to sign <br /> and return forms to Ecology and publish the required public notices. <br /> • Permit coverage will be transferred to the Operator (Contractor) after bid award and <br /> before construction. All permit fees will be paid by permittee and transfer of <br /> coverage will be included in the project manual. <br /> • The Stormwater Pollution Protection Plan (SWPPP) will be indicated to be provided <br /> by Contractor in specifications and permit compliance will be addressed by <br /> Contractor. <br /> Deliverables: <br /> • Draft and final NOI submitted electronically by CONSULTANT. <br /> • Specification language for Contractor compliance and permittee responsibility. <br /> Maple Heights Bridge Seismic Retrofit 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.