Laserfiche WebLink
vegetation areas that are assumed to be disturbed by the project near the bridge. Drawings <br /> will be prepared under the supervision of a WA Professional Landscape Architect and will be <br /> included in the PS&E set along with an opinion of construction cost. <br /> Assumptions: <br /> • The restoration drawings will address restoration of pre-project vegetation and soil <br /> conditions and will include information for seeding/mulching and native vegetation <br /> restoration: drawing plan sheets and legends, details, and general notes. <br /> • Restoration drawings may be included in the Critical Areas Report for restoration of <br /> temporary stream buffer impacts. <br /> • No park pavement or park structures will be disturbed or restored by the PROJECT. <br /> Deliverables: <br /> • Review final park restoration drawings and cost estimate provided at 90%and Final <br /> PSE. <br /> Task 5.6 NPDES Construction Stormwater General Permit (CSGP) <br /> The construction of the PROJECT is not expected to require an acre or more of cumulative land <br /> disturbance triggering CSGP Notice of Intent (NO1) submittal. However, submitting for permit <br /> coverage is advised since work will occur over Glenwood Creek and permit coverage could be <br /> required by ecology due to potential water quality risks to the stream. If no permit is obtained <br /> prior to construction, Ecology could require coverage during construction and cause <br /> construction delays. <br /> Assumptions: <br /> • The CONSULTANT will prepare and submit a NOI electronically after issuance of <br /> SEPA exemption or SEPA determination. <br /> • The CITY will be provided with applicant forms after submittal and will need to sign <br /> and return forms to Ecology and publish the required public notices. <br /> • Permit coverage will be transferred to the Operator (Contractor) after bid award and <br /> before construction. All permit fees will be paid by permittee and transfer of <br /> coverage will be included in the project manual. <br /> • The Stormwater Pollution Protection Plan (SWPPP) will be indicated to be provided <br /> by Contractor in specifications and permit compliance will be addressed by <br /> Contractor. <br /> Deliverables: <br /> • Draft and final NOI submitted electronically by CONSULTANT. <br /> • Specification language for Contractor compliance and permittee responsibility. <br /> Maple Heights Bridge Seismic Retrofit 17 <br />