My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7.4 Prepare Concept Design Report (CDR) <br /> The CONSULTANT will prepare and submit a draft CDR providing description of the analysis <br /> and section capacity/demand ratios, pre- and post-retrofit, on proposed parts/members to <br /> be retrofitted. If there are multiple elements for a given structure that require seismic <br /> retrofit, the CONSULTANT will identify a recommended priority for the retrofit of the <br /> various elements. The CDR will include conceptual retrofit strategies, including the concept <br /> details, constructability Memo, and conceptual cost estimates of the proposed retrofit <br /> strategies. <br /> The CONSULTANT will revise the draft report based on written comments on the draft <br /> report received from the CITY and submit a final report for review and approval. <br /> Assumptions: <br /> • Concept Design Report plans and cost estimate will be provided by incorporating the <br /> proposed schematic retrofits developed for the Draft CDR. Inclusion of additional <br /> retrofit concepts or major reconfiguration of the retrofit concepts illustrated in the <br /> Draft CDR will be considered "Out-of-Scope" Work and will be negotiated as such. <br /> Deliverables: <br /> • Draft Conceptual Design Report—one (1) electronic (PDF) and one (1) hard copy <br /> • Final Conceptual Design Report-one (1) electronic (PDF) and two (2) hard copies <br /> Maple Heights Bridge Seismic Retrofit 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.