My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8 Plans, Specifications, and Engineer's Estimate <br /> The CONSULTANT will prepare contract plans, specifications and engineer's estimate of <br /> probable construction costs for the seismic retrofit of the Maple Heights Bridge, as illustrated in <br /> the Concept Design Report. <br /> Seismic Retrofit Contract Plans <br /> CONSULTANT will advance design of the recommended retrofit presented in the CDR and <br /> prepare contract plans of those solutions for Project advertisement. The CONSULTANT will <br /> prepare 60%, 90%, and final contract plans for CITY review, comment, approval and <br /> advertisement. CONSULTANT will maintain design documentation including design <br /> calculations. CONSULTANT will develop the following: <br /> PS&E Assumed PS&E Submittal Phase <br /> Sheet Name j Number of <br /> Sheets 60% 90% 100% <br /> Cover Sheet 1 X X X <br /> Index Legend and Abbreviations 1 X X X <br /> General Notes 1 X X X <br /> Site Prep and TESC(Perteet) 1 X X X <br /> Construction Staging 1 X X X <br /> Grading and Slope Protection (As- 2 <br /> desired) X X X <br /> Drainage Plans and Details (Perteet) 2 X X X <br /> Traffic Control& Detour MOT 4 <br /> (Gibson) X X X <br /> Bridge Plan& Elevation—Retrofit 1 X X X <br /> Locations <br /> General Structural Notes 1 X X X <br /> Bridge Construction Sequencing 1 X X X <br /> West Abutment Retrofit and Details 2 X X X <br /> Pier 1 Retrofit- Elevation 1 X X X <br /> Pier 2 Retrofit- Elevation 1 X X X <br /> Pier 3 Retrofit- Elevation 1 X X X <br /> Pier 1, 2, and 3 Retrofit Details 2 X X X <br /> East Abutment Retrofit& Details 2 X X X <br /> East and West Abutment Bearing 2 X X X <br /> Replacement <br /> Superstructure Retrofit and Details 2 X X X <br /> Misc. Bridge Repairs 1 X X X <br /> Restoration Plans (Perteet) 2 X X X <br /> Maple Heights Bridge Seismic Retrofit 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.