My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 8.2 90% Design Package Submittal <br /> This task includes all activities associated with advancing the 60%design package to the 90% <br /> level and submitting the intermittent design package to the City for review purposes. The 90% <br /> design package submittal will include two copies of half-size plans, project manuals, estimate <br /> and construction schedule. Electronic copies of the plans, cost estimate, construction schedule <br /> and responses to the 60%comments response will also be provided. Hard-copy sheets will <br /> match the electronic files that are submitted. The work will be substantially complete at this <br /> stage. Drawings will be completed and checked in accordance with established QC procedures <br /> and will have incorporated or resolved comments made during the 60% design review and <br /> other informal reviews.The cost estimate will be formatted to reflect the bid item breakdown <br /> utilizing CITY cost estimating form. <br /> Deliverables: <br /> • Two (2) hardcopies of half size plans. An electronic copy of the plans in PDF format. <br /> • Two (2) hardcopies of the Project Specifications Manual. An electronic copy of the <br /> Project Specifications Manual in PDF format. An electronic copy of the Project <br /> Manual in Word format (no Appendix). <br /> • Two (2) hardcopies of the cost estimate and construction schedule. An electronic <br /> copy of the cost estimate in PDF format. <br /> • An electronic copy of responses to 60%comments in Excel and PDF formats. <br /> • An electronic copy of the construction schedule in PDF format. <br /> Task 8.3 Final (100%) Bid Package Submittal <br /> This task includes all activities associated with advancing the 90% design package to the 100% <br /> level and submitting the construction documents design (Bid) package to the City for review <br /> and advertisement purposes.The Bid Submittal will include one (1) full-size plan set and (1) <br /> half-size plan set printed on bond paper, (1) hard copy and of the project manual, (1) hard copy <br /> of Engineer's Opinion of Cost and Construction Schedule. Drawings will be stamped and signed <br /> by the appropriate CONSULTANT team professional licensed in the State of Washington. Hard- <br /> copy sheets will match the electronic files. <br /> Deliverables: <br /> • One original stamped and signed full size plan set <br /> • One half size copy of the 100% plans <br /> • One original stamped and signed Project Specifications Manual. <br /> • One copy of the Engineer's Opinion of Cost <br /> • One copy of the 100%Construction Schedule <br /> • Electronic copies of the plans and project Manual <br /> Maple Heights Bridge Seismic Retrofit Z� <br />
The URL can be used to link to this page
Your browser does not support the video tag.