My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In providing opinions of cost, and schedules for the PROJECT, the CONSULTANT will have no <br /> control over cost or price of labor and materials; unknown or latent conditions of existing <br /> equipment or structures that might affect operation or maintenance costs; competitive bidding <br /> procedures and market conditions; time or quality of performance by operating personnel or <br /> third parties; and other economic and operational factors that might materially affect the <br /> ultimate PROJECT cost or schedule.The CONSULTANT, therefore, will not warranty that the <br /> actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from <br /> CONSULTANT's opinions, analyses, projections, or estimates. <br /> Assumptions: <br /> • Engineer's estimate will be prepared using the CONSULTANTS standard estimating <br /> spreadsheet. <br /> • All Seismic Retrofit 'items' will be prepared as lump sum items with a lump sum <br /> breakdown provided. <br /> Deliverables: <br /> • One (1) electronic copy of the engineer's estimate at the 60%, 90%, final review <br /> submittals and the bid submittal. <br /> • Independent bottom up cost estimate at 90%design. <br /> Task 8.1 60% Design Package Submittal <br /> This task includes all activities associated with advancing the approved seismic retrofit concepts <br /> to the 60% level and submitting the intermittent design package to the City for review <br /> purposes. The 60% design package submittal will include two copies of half-size plans, project <br /> manuals, cost estimates and construction schedule. Electronic copies of all files will be <br /> provided in PDF format. An electronic copy of the Project Specifications Manual will be <br /> provided in Word format. Hard-copy sheets will match the electronic files that are submitted. <br /> The cost estimate will be formatted to reflect the bid item breakdown. <br /> Deliverables: <br /> • Two (2) hardcopies of half size plans. <br /> • Two (2) hardcopies of the Project Specifications Manual. An electronic copy of the <br /> Project Specifications Manual in PDF format. An electronic copy of the Project <br /> Specifications Manual in Word format (no Appendix). <br /> • Two (2) hardcopies of the cost estimate and construction schedule. An electronic <br /> copy of the cost estimate in Excel and PDF formats. <br /> • An electronic copy of the construction schedule in PDF format. <br /> Maple Heights Bridge Seismic Retrofit 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.