My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E-Sub-consultant Cost Computations <br /> Washington State Transportation Building <br /> Department of Transportation 310 Maple Park Avenue S.E. <br /> P.O.Box 47300 <br /> Olympia,WA 98504-7300 <br /> 360-705-7000 <br /> TTY:1-800-833-6388 <br /> www.wsdot.wa.gov <br /> July 24, 2018 <br /> 1 Alliance Geomatics <br /> 1261A - 120th Avenue NE <br /> Bellevue, WA 98005 <br /> Subject: Acceptance FYE 2017 ICR—Audit Office Review <br /> CORRECTION(FYE 2017) <br /> Dear Mr. Micael Paradis: <br /> Transmitted herewith is the WSDOT Audit Office's memo of"Acceptance" of your <br /> firm's FYE 2017 Indirect Cost Rate (ICR) of 157.56%. This rate will be applicable for <br /> WSDOT Agreements and Local Agency Contracts in Washington only. This rate may <br /> be subject to additional review if considered necessary by WSDOT. Your ICR must be <br /> updated on an annual basis. <br /> Costs billed to agreements/contracts will still be subject to audit of actual costs, based <br /> on the terms and conditions of the respective agreement/contract. <br /> This was not a cognizant review. Any other entity contracting with your firm is <br /> responsible for determining the acceptability of the ICR. <br /> If you have any questions,feel free to contact our office at(360) 705-7019 or via email <br /> consultantrateswsdot.wa.gov. <br /> Regards; <br /> ERIK K. JONSON <br /> Manager, Consultant Services Office <br /> EKJ:rck <br /> Acceptance ICR Audit Office Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.