My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 5/15/2019
>
Contracts
>
6 Years Then Destroy
>
2020
>
TranTech Engineering LLC 5/15/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 9:51:30 AM
Creation date
6/4/2019 10:27:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
5/15/2019
Council Approval Date
5/1/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
Design of Maple Heights Seismic Retrofit
Tracking Number
0001812
Total Compensation
$267,925.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 4/15/2020 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E-Sub-consultant Cost Computations <br /> Consultant Fee Determination <br /> Maple Heights Bridge Seismic Retrofit Project <br /> Work Element 3-Geotechnical(HWA) <br /> Project Principal IX Principal VIII Geotechnical Geotechnkal Geotechnical Geotechnlol Geotechnical Geologist Geologist Geologist Controler CAD Clerical Total <br /> Manager Engineer Engineer Engineer Engineer Engineer V IV II Tech. <br /> VI VI IV II <br /> Work Element 4.1-Grlotachncial <br /> Project Setup: 2 2 4 <br /> Attend Project Kickoff Meeting: 4 4 <br /> Collect and Review Available Geotechnical Data: 4 6 4 14 <br /> Develop Geologic Profile: 2 3 3 6 <br /> Generate Seismic Design Paramters: 2 S 6 16 <br /> Evaluate geologic hazards: 2 2 4 <br /> Evaluate Potential for Liquefaction: 4 4 6 <br /> Perform geotechnical foundation resistance assessment: 1 2 3 <br /> Project Coordination Meetings: 4 8 8 20 <br /> Geotechnical OA/QC: 4 8 <br /> 4 <br /> Prepare Draft Geotechnical Engineering Memo: 4 4 8 <br /> Respond to City of Everett and Design Team Comments: 4 1 e 12 3 1 27 <br /> Miscellaneous Geotechnical Analysis: 4 4 <br /> Geotechnical Task Management7 6 15 <br /> Total Staff Hours 0 4 0 47 S 39 45 4 4 0 0 2 9 1 133 <br /> Direct Rates $84.62 t80A0 $6675 $63.00 $50.00 838.50 335.00 841.00 $37.75 827.00 $35.50 838.00 824.00 <br /> Total Direct Salary Cost 80 8338 80 83,137 8804 81,980 $1,733 $140 $164 so $0 $71 8342 824 88,403 <br /> Total Labor Cost $0,403 <br /> OH at 194.47%of Direct Labor 816,342 <br /> Profit at 27.55%of Direct Labor 82315 <br /> Total $27.080 <br /> Direct Costs(Mileage,Reproduction,Shipping,etc.) $200 <br /> Grand Total: $27,260 <br /> Pape 3 ar 5 NE 4 Gage... <br />
The URL can be used to link to this page
Your browser does not support the video tag.