Laserfiche WebLink
Exhibit E-Sub-consultant Cost Computations <br /> Washington State Transportation Building <br /> On Department of Transportation 310 Maple Park Avenue S.E. <br /> P.O.Box 47300 <br /> Olympia,WA 98504-7300 <br /> 360-705-7000 <br /> TTY:1-800-833-6388 <br /> www.wsdot.wa.gov <br /> June 5,2018 <br /> HWA GeoSciences, Inc. <br /> 21312 30th Drive SE, Suite 110 <br /> Bothell, WA 98021 <br /> Subject: Acceptance FYE 2017 ICR—CPA Report <br /> Dear Vasiliy Babko: <br /> We have accepted your firms FYE 2017 Indirect Cost Rate (ICR) of 194.47% (rate <br /> includes 0.35% Facilities Capital Cost of Money) based on the "Independent CPA <br /> Report," prepared by T. Wayne Owens & Associates. This rate will be applicable for <br /> WSDOT Agreements and Local Agency Contracts in Washington only. This rate may <br /> be subject to additional review if considered necessary by WSDOT. Your ICR must be <br /> updated on an annual basis. <br /> Costs billed to agreements/contracts will still be subject to audit of actual costs, based <br /> on the terms and conditions of the respective agreement/contract. <br /> This was not a cognizant review. Any other entity contracting with the firm is <br /> responsible for determining the acceptability of the ICR. <br /> If you have any questions, feel free to contact our office at(360) 705-7019 or via email <br /> consultantrateswsdot.wa.gov. <br /> Regards; <br /> Jonson,Erik <br /> Jun 6 2018 3:24 PM <br /> cosisn <br /> ERIK K. JONSON <br /> Manager, Consultant Services Office <br /> EKJ:rck <br /> Acceptance ICR CPA Report <br />