PUBLIC WORKS PROJECTS UNDER CONSTRUCTION <br /> SIGNATURE C=COUNCIL % <br /> PROJECT CONTRACTOR BID DATE ONLY IF CO CHANGE ORDER PLUS APPROVAL CHANGE COST TO DATE NOTES <br /> TOTAL IS ORIGINAL BIDS&TAX M=MAYOR ORDER (INCL WSST) <br /> UNDER: SIGNATURE OF BID <br /> CLEVELAND AVENUE INTERWEST CONSTRUCTION 3/27/2018 Notice to Proceed was issued for April 1st,2019. Contractor <br /> SEWER SYSTEM installed sanitary sewer in Summit Avenue,beginning @ <br /> REPLACEMENT AND 609 NORTH HILL BOULEVARD California Street,northward across Everett Avenue.Installed <br /> STORMWATER BURLINGTON WA 98233 sewer in alleyway north of California Street and in alleyway <br /> SEPARATION CO#2 north of Everett Avenue Summit to Harrison Avenue. <br /> Installed storm drainage in California Street,Harrison to <br /> CO#1 Summit Avenue. Installed storm drainage in Summit/Everett <br /> $676,649.65 CO TOTAL Avenue intersection and in 26th Street west of <br /> Cleveland/26th Street intersection. No bid item was <br /> BASE BID Sch A $2,522,552.00 provided for replacing concrete roadway subbase that is <br /> BASE BID Sch B $3,249,257.00 overlaid with asphalt on Summit and Everett Avenues. <br /> Future change order#1 will be written to address this. No <br /> BASE BID PRICE $5,771,809.00 dollars are shown on this report as work on the project had <br /> WSST Sch A ONLY $244,687.54 started after pay period ending 3-29-19. <br /> Total cost incl CO's $6,016,496.54 $0.00 <br /> NORTH BROADWAY MCCANN CONSTRUCTION 9/11/2018 Contractor has yet to complete installation of solar lighting <br /> TRANSIT IMPROVEMENTS <br /> ENTERPRISES,INC. panels in the new bus shelters. This is essentially what <br /> remains to be completed prior to being able to issue <br /> P.O.Box 3211 CO#1 0.0% Substantial Completion. <br /> RENTON,WA 98056 $299,976.41 CO TOTAL $0.00 <br /> BASE BID PRICE $2,249,764.10 <br /> TOTAL CONTRACT $2,249,764.10 1,896,342.40 <br /> WSST $0.00 _ <br /> TOTAL COST $2249,764 10 $1,896,342.40 <br /> WATERMAIN REECE CONSTRUCTION 3/6/2018 CO#1 $0.00,r 0.0% Contractor has installed all new 12-inch earthquake resistant <br /> REPLACEMENT"S" pipe up Federal Avenue from Lombard Avenue. Contractor <br /> 3527 238th STREET NE $245,163.70 CO TOTAL $0.00 had issues with being able to pressure test the new main <br /> ARLINGTON,WA 98223 BASE BID PRICE $1,701,637.00 line,however as of 5-10-19,completed a successful <br /> WSST $165,058.79 $1,217,951.29 pressure test of the new main and is now scheduling tie ins <br /> to be completed,once purities results have been received. <br /> TOTAL BASE BID $1,866,695.79 $118,141.27 <br /> TOTAL Incl.CO's $1,866,695.79 <br /> $1,336,092.56 <br /> AIM. <br /> Page 3 <br />