Laserfiche WebLink
said work could not reasonably have been completed within the <br /> time prescribed in the permit. Whenever a permit shall have <br /> expired and not have been extended, re-application and payment of <br /> permit fees as herein required shall be made before a new permit <br /> is granted. <br /> Section 9: FEE SCHEDULES <br /> Every person doing work under the provisions of this ordinance <br /> shall, before permit is issued, pay to the City Treasurer the <br /> following fees: <br /> No permit shall be issued to any one person for less than <br /> One ($1. 00) Dollar. <br /> (A) FEES for single family dwellings <br /> 100 amp service $12 . 00 <br /> Not more than 150 amp service 15. 00 <br /> Not more than 200 amp service 18. 00 <br /> Not more than 300 amp service 25. 00 <br /> Not more than 400 amp service 35. 00 <br /> More than 400 amp service 5. 00 per hundred amp <br /> or fraction thereof <br /> Temporary service for Resi- <br /> dential Building 2. 00 <br /> (B) FEES for multiple family dwellings . FEES shall be <br /> computed at the following rate per meter: <br /> 100 amp service $12. 00 <br /> 150 amp service 15. 00 <br /> 200 amp service 18. 00 <br /> House meter shall be $12. 00 additional. <br /> Each apartment shall be considered as a separate service. <br /> (C) FEES for all commercial or industrial work. The fee <br /> for a permit for a proposed electrical installation <br /> shall be determined from the cost to the vendee of all <br /> labor and materials, fittings, devices, apparatus and <br /> the like, used as a part of, or in connection with, <br /> a complete electrical system as follows : <br /> $250 or less $10. 00 <br /> 251. 00 - 1, 000. 00 10. 00 plus 2% <br /> 1, 001. 00 - 4, 000. 00 30. 00 plus 1% <br /> Over 4 , 000. 00 70. 00 plus 1/2 of 1% <br /> Where the vendee supplies materials, devices , fittings , <br /> apparatus, switchgear, transformers and the like, the <br /> value of such equipment must be included in the contract <br /> price. In the event the cost of the vendee' s supplied <br /> equipment is not given, the total permit fee shall be <br /> the amount computed from the above schedule plus <br /> 50%. The contractor shall be held liable for the <br /> total permit fee. <br /> (D) Permit fees for Feeders and Altered Services. The <br /> fee schedules for services and feeders under 600 volts <br /> not covered under (a) or (b) schedules shall be <br /> computed as follows : <br /> Not exceeding 100 amperes $ 5. 00 <br /> Not exceeding 150 amperes 7. 00 <br /> Not exceeding 200 amperes 10. 00 <br /> Not exceeding 300 amperes 15. 00 <br />