Laserfiche WebLink
Not exceeding 400 amperes 20. 00 <br /> Not exceeding 600 amperes 30. 00 <br /> Not exceeding 1000 amperes 40. 00 <br /> Not exceeding 1500 amperes 50. 00 <br /> Exceeding 1500 amperes 75. 00 <br /> (E) Feed for Services and Feeders over 600 volts. <br /> 1 - KVA or less 5. 00 <br /> 5 - KVA or less 10. 00 <br /> 15 - KVA or less 25. 00 <br /> 20 - KVA or less 30. 00 <br /> 30 - 50 KVA 40. 00 <br /> Over 50 KVA 50. 00 <br /> (F) Permit fees for Lighting Circuits of twenty amperes or less. <br /> To install one of the following circuits of twenty amperes <br /> of less, the permit fee shall be as follows: <br /> Branch lighting circuits <br /> Portable appliance circuits <br /> Convenience outlet circuit <br /> Temporary lighting circuits, except in residences <br /> Annunciator or signal circuit <br /> Sound recording and reproducing circuits <br /> Central sound and distribution circuits <br /> Public address systems <br /> Electric supply circuits <br /> Domestic furnace circuits, oil or gas fired <br /> Class 1 & 2 signal circuits <br /> Low voltage power and alarm circuits <br /> Two-wire circuits $1. 00 <br /> Three-wire circuits 2. 00 <br /> Four-wire circuits 3. 00 <br /> (G) Permit fee for Heating, Cooking and Special Equipment <br /> Circuits. To install one of the following circuits <br /> the permit fee shall be as follows: <br /> Cooking appliance circuits <br /> Heating equipment circuits <br /> Furnace circuit <br /> Welding equipment circuit <br /> Transformer circuit <br /> X-Ray machine circuit <br /> Incandescent lighting circuits <br /> Special lighting circuits <br /> Experimental or testing panel circuits <br /> Circuits for other unspecified equipment <br /> 8 KVA or less $ 3. 00 <br /> Over 8 KVA and not over 20 KVA 4 . 00 <br /> Not over 30 KVA 5. 00 <br /> Not over 50 KVA 7. 00 <br /> Not over 100 KVA 10. 00 <br /> Not over 200 KVA 12. 00 <br /> Over 200 KVA 15. 00 <br /> (H) Permit fee to Install Motor Circuits <br /> To install a motor circuit the permit fee shall be <br /> computed from the following schedules: <br /> Fractional to 1 HP $ 1. 00 <br /> Not more than 6 HP 2. 00 <br /> Not more than 15 HP 3. 00 <br /> Not more than 25 HP 4. 00 <br />