Laserfiche WebLink
•1 <br /> 2 Section 2. Sewer Construction Charges <br /> 3 The charges and rates allocated for sanitary sewer construction for classes <br /> 4 <br /> of users connected and to be connected to the sanitary sewer system or the <br /> 5 <br /> combined sewer system are hereby fixed at the following monthly rate: <br /> 6 <br /> 7 (a) Single family residence <br /> 8 Trunk Lateral <br /> 9 North Everett None None <br /> 10 Bond Issue No. 1 System $0.20 $2. 10 <br /> 11 Bond Issue No. 2 System $1. 15 $2.25 <br /> 12 Bond Issue No. 3 System $2.25 $2.75 <br /> 13 <br /> The applicable construction charge shall be established by determining the <br /> 14 <br /> bond issue from which the funds were provided for the construction of that portion <br /> 15 <br /> 16 of the City's sewer system to which the sewer connects. <br /> 17 Each such applicable construction charge shall terminate upon full payment <br /> 18 of the bonded indebtedness to which such construction charge relates. <br /> 19 The applicable monthly trunk construction charge shall be paid by all property. <br /> 20 The applicable monthly lateral construction charge shall be paid by all <br /> 21 <br /> property which has not been charged by local improvement district assessment <br /> 22 <br /> or otherwise with the cost of a lateral sewer. <br /> 23 <br /> Payments of the construction charge for either the trunk and/or the lateral <br /> 24 <br /> 25 sewer construction shall commence at the time of physical connection to the <br /> 26 sewer system. <br /> 27 <br /> 28 <br /> 29 <br /> 30 <br /> 31 <br /> 32 <br /> Page 2 <br />