My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:28:04 AM
Creation date
6/17/2019 10:00:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1708-033
Year
2017
Notes
PAINT BOOTHS 3 AND 4
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. _ .. <br /> P2P PUMP SCHEDULE- SPRAY/PREP BOOTH #2 <br /> r , <br /> CALLOUT PUMP FLUID MOTOR[3] BASIS OF DESIGN <br /> TOTAL HEAD TEMP <br /> TYPE MARK LOCATION SERVICE TYPE SPEED RPM FLOW(GPM) (FT) (%%DF) HP BHP MANUFACTURER MODEL NOTE$ <br /> IWP 27 P2P-PANEL PAINT 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7.50 4.57 SUMMIT PUMP, INC 2796SP [2�, [4] <br /> IWP 28 P2P-PANEL PAINT 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7,50 4,57 SUMMIT PUMP, INC 2796SP [2}, [4] . <br /> IWP 29 P2P-PANEL PAINT 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7.50 4,57 SUMMIT PUMP, INC 2796SP [2], [4] <br /> IWP 30 P2P-PANEL PREP 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7.50 4,57 SUMMIT PUMP, INC 2796SP [2], [4] <br /> IWP 31 P2P-PANEL PREP 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7.50 4.57 SUMMIT PUMP, INC 2796SP [2], [4] <br /> IWP 32 P2P-PANEL PREP 2 PLENUM INDUSTRIAL WASTE CENT. CONST. 3500 50 106 68 °F 7.50 4,57 SUMMIT PUMP, WC 2796SP [2], [4] 7 <br /> ; <br /> SCHEDULE NOTES: <br /> [1] NOT USED. <br /> [2] PROVIDE WITH INITIAL IMPELLER AS SCHEDULED. FOLLOWING INSTALLATION AND BALANCING, PROVIDE REPLACEMENT OR TRIMMED IMPELLER FOR ACTUAL CONDITIONS. <br /> [3] PROVIDE WITH VFD RATED MOTOf�, SEE ELECTRICAL DESIGN DOCUMENTS FOR VFD SPECIFICATIONS. ELECTRICAL TO PROVIDE VFD. VFD TO BE FIELD INSTALLED. <br /> [4] PROVIDE WITH EXPLOSION PROOF MOTOR. <br /> [5]ALL BRONZE CONSTRUCTION. • <br /> P2P VACUUM SEPARATOR SCHEDULE - SPRAYIPREP BOOTH #2 <br /> CALLOUT BASIS OF DESIGN ` . <br /> TYPE MARK LOCATION SERVICE HElGHT DIAMETER INLET SIZE OUTLET SIZE STf3RAGE FILTER MANUFACTURER MODEL NOTES <br /> SE 2 EXTERIOR OF P2P- GUN CLEANING VACUUM 20'- 0" 3'-4° 4" 8" 8 CF [5] HOFFMAN HPC- 14-84 [1], [2], [3], [4] <br /> SCHEDULE NOTES: <br /> [1] PROVIDE EXPLOSION PROTECTION ISOLATION VALVE, INSTALL VALVE PER MANUFACTURER RECOMMENDED MOUNTING DISTANCE UPSTREAM OF SEPARATOR. <br /> [2] PROVIDE PLATTCO DOUBLE DUMP DISCHARGE VALVE, CONTROLLED BY 120V AC SOLENOIDS. � <br /> [3] PROVIDE LEVEL SENSOR UPSTREAM OF SEPARATOR. <br /> [4] PROVIDE DEFLECTOR PLATE OUTSIDE OF EXPLOSION VENT. <br /> [5] PROVIDE DONALDSON-TORIT ULTRA-WEB MEDIA FILTER. <br /> r • <br /> P2P VACWM EXHAUSTER SCHEDULE - SPRAYIPREP BOOTH #2 <br /> CAPACITY STATIC VACUUM MATERIAL BASIS OF DESIGN <br /> TYPE MARK LOCATION SERVICE HElGHT LENGTH WIDTH INLET SIZE OUTLET SIZE (SCFM) PRESSURE MOTOR HP Kst Pmax MANUFACTURER MODEL NOTES <br /> EX 2 EXTERIOR OF P2P- GUN CLEANING VACUUM 3' - 1 1/2" 6'- 1° 2'- 101/2" 6° 6" 500 8.5 inHg 25 178 8.7 HOFFMAN 4206-ADGI [1], [2] <br /> SCHEDULE NOTES: � <br /> [1] PROVIDE INLINE SILENCER AND WEATHER HOOD AT DISCHARGE. <br /> [2] PROVIDE WITH VFD RATED MOTOR. SEE ELECTRICAL DESIGN DOCUMENTS FOR VFD SPECIFICATIONS. ELECTRICAL TO PROVIDE VFD, VFD TO BE FIELD WSTALLED, <br /> P2P PLUMBING FIXTURE SCHEDULE - SPRAY/PREP BOOTH#2 � � <br /> BRANCH PIPE SIZE - INCHES DIA. BASIS OF DESIGN <br /> MARK FIXTURE DESCRIPTION COLD WATER HOT WATER WASTE VENT ADDITIONAL COMPONENTS MANUFACTURER MODEL NOTES <br /> ES-1 EMERGENCY SHOWER& EYEWASH STATION 1 1/4" 1 1/4° HAWS CORPORATION 8300-8325 <br /> EW-1 EMERGENCY EYEWASH 1° HAWS CORPORATION 7656WCC <br /> FD-1 FLOOR DRAIN 2" 1 1/2° JAY R MITH 2110 . <br /> FP-1 BREATHING AIR FILTER PANEL ENMET AFS-50 [2], [3] <br /> HB-1 HOSE BIBB 3/4" WATTS LFBD 3/4"X3/4° <br /> HR-1 HOSEREEL 1 1/4° PR�VIDE WITH MOUNTING BRACKET (MODEL NUMBER 15725}, COXREELS TSH-N-650-WM [1] <br /> � SCHEDULE NOTES: <br /> r <br /> [1] TO BE USED FOR PROCESS WATER. <br /> [2] DRAIN END TO BE OPEN ENDED. <br /> [3] FILTER PANEL SUPPLIED WITH 1/2"�A BRANCH, <br /> P2P WATER HEATER SCHEDULE - SPRAY/PREP BOOTH#2 <br /> CALLOUT BURNER GAS BURNER [4] ELECTRICAL BASIS OF DESIGN <br /> MIN(MUM fFFiC1ENCY INPUT MIN INLET GAS CONNECTION <br /> TYPE MARK NOMINAL HP [1] TYPE [2] WATER FLOW(GPM) MIN WATER FLOW(GPM) EWT LWT (ET) [5] WATER PD (FT) PRESSURE RATING (PSIG) FUEL (3] (MBH) PRESSURE (IN WG) SIZE VOLTAGE PHASE FREQUEN MA F CTUR MODEL NOTES <br /> WH 1 39 WT 125 0 55 °F 140 °F 96% 32 160 NG 1300 4 1 1/2" 120 1 60 AO SMITH XWH-1300 [ [7l� L$l� L9l � . <br /> SCHEDULE NOTES: <br /> [1] NOMINAL BOILER HORSEPOWER INCLUDED FOR REFERENCE ONLY- DO NOT USE FOR FINAL SIZING OF EQUIPMENT [6] PROVIDE WITH OPTIONAL CONDENSATE NEUTRALIZATION KIT FOR EACH HEATER. <br /> [2] WT =WATER TUBE; FT = FIRETUBE [7] PROVIDE WITH OPTIONAL BACNET BMS GATEWAY <br /> [3]WHERE TWO FUELS LISTED, BURNER SHALL FIRE BOTH FUELS, FIRST FUEL SHALL BE PRIMARY FUEL. [8] PROVIDE WITH OPTIONAL SINGLE POINT POWER CONNECTION KIT FOR EACH HEATER, <br /> [4) PROVIDE CSD-1 BURNER TRIM. [9]WATER HEATER CIRCULATOR PUMPS SHALL BE PROVIDED BY THE WATER HEATER MANUFACTURER � <br /> [5] MINIMUM EFFICIENCY AS SCHEDULED AND AS REQUIRED BY THE SEATTLE/WASHINGTON STATE NON-RESIDENTIAL TO ENSURE SINGLE-SOURCE RESPONSIBILITY OF THE EQUPiMENT. 7 <br /> ENERGY CODE. AFUE =ANNUAL FUEL UTILIZATION EFFICIENCY, EC = COMBUSTION EFFICIENCY, ET= THERMAL EFFICIENCY. <br /> ► < <br /> ► , <br /> � <br /> � ` <br /> 900 SW 16th Street Suite 307 FSi consulting engineers <br /> � Renton, Washington 98057 Solutions & Service <br /> � <br /> SYM REVISION BY � APPROVED DATE SYM REVISION BY APPROVED �aTE ACCEPTABILITY DRAWN DATE SUBTITL� CURRENT REVISION SYMBOL DATE � .. <br /> 0 IssueForConstruction FSi Bsc 03/08116 5 Revision-Release56 FSi BSC 11/15/16 �, w. �q THISDESIGNAND/OR NHECKED o$'o$'�' PLUMBING/PROCESS EQUIPMENT SCHEDULES W2548317 7 os�os��7 0 <br /> ��' o�"�� � SPECIFICATION ISAPPROVED RED 08108/17 SHEET � <br /> 1 Revision-Release 40 FSi BSC 04/05/16 6 Revision-Release 59 FSi BSC 01I10117 �O � � z�y"°1� �'' o ENGINEER TITLE � <br /> E, � z APPROVED BY DEPT. DATE �SC 08/08/17 Boeing 777X CWC BUILDING o <br /> 2 Revision-Release 47 FSi BSC 07/12i16 7 REV-RELEASE 72(PHASE II-PHP) FSi AWL OS/O8/'I� CHECKED ��,n'� e ' <br /> 3 Revision-Release 48 FSi BSC 07/26/16 P�'�Fss`oNA���a�`�`'� REp o�Eo B U I L D I N G 40'�V JOB NO. r r cOMP N0. � <br /> 40-58-M2wa N <br /> 4 Revision-Release 51 FSi BSC O9/O6/'I6 APPROVED DwG NO. <br /> ° os�os��� MECHANICAL MASTER EVERETT, WA 40-58-M2wa <br />
The URL can be used to link to this page
Your browser does not support the video tag.