Laserfiche WebLink
PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> Community Transit Swift II BRT— Corridor Stations (90% Design Level Comments) <br /> Job Charge: WSDOT Project Engineer: Office&Mail Stop: Phone: Date: She- <br /> Varies by Discipline June 22, 2017 • of 8 <br /> Office: Comments by: Commenting Office&Mail Stop: Commentor's Phone: Date: <br /> Everett Public Works/Planning February 3, 2017 . <br /> # <br /> Sht/Pg Reviewer's Comment By Designer's Response Init. <br /> 13 Station#SB 3037. There is a drainage detention The drainage detention system at Station#SB 3037 Otak <br /> pipe at this location. The plans show this being (Kasch Park Southbound) is proposed to be relocated <br /> relocated but it will still be in the immediate vicinity north of the Station and behind the existing sidewalk. <br /> of this Station. We will need to do annual Annual storm drainage maintenance impacts to Stations <br /> inspections and maintenance. This will require (such as vactoring) are a typical situation for Community <br /> closure of the bus stop during the maintenance Transit Operations. With advanced notice, the pick-up <br /> interval. Community Transit must provide a letter location can be shifted temporarily to avoid a conflict with <br /> to the City of Everett stated that this will be an the maintenance work. <br /> acceptable situation. As an option the station <br /> would need to be moved south 500-700 ft. <br /> 14 - Station# NB 3018 has a catchbasin and a water The existing catch basin and water valve at Station #NB Otak <br /> valve that need to be kept clear for maintenance. 3018 (Kasch Park Northbound) have a minimum of 2-ft of <br /> Insure that there is a minimum of 2' of overhead overhead clearance provided. The shelter canopy <br /> clearance at the catchbasin for vactor truck extends only 5-ft from the centerline of the footings; <br /> access or relocate the catchbasin. providing 2-ft clear for the valve and 4+ feet of clear for <br /> the catch basin. The canopy also sits at a height of over <br /> 9-ft at the outside edge of the structure. In addition, the <br /> existing catch basin is needed for the shelter downspout <br /> connection. <br /> Utility Conflict Review <br /> 15 The rerouting of the water main at Station 3019 Halley The existing water main at Station 3019 (100th Street SW Otak <br /> should be done on the street side of the project Kimball Northbound) is proposed to remain at its existing <br /> and not along the back side of the station as location. A special retaining wall and shelter foundation <br /> proposed. configuration for this location is shown on sheet F1.06 of <br /> the Plans. <br /> Swift ii BRT Everett Public Works Comment Sheet_90 Stations_OtakResponse.doc <br />