My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After the fourth paragraph, add the following: <br /> Shop drawing for signal standards and lighting standards shall be provided in an electronic format, either <br /> AUTOCAD Release 14 or later, as well as complying with Section 6-03.3(7). <br /> Section 8-20.2(1) is supplemented as follows: <br /> Contracting Agency-Supplied Materials <br /> The Contracting Agency will procure through WSDOT the following materials for the bid item, "SR 96 (132nd <br /> Street SE) at 16th Avenue SE Traffic Signal Modifications, Complete": <br /> Description <br /> One new Type 332 cabinet with auxiliary file, and including related equipment (display panel, flashers, load <br /> switches, flash transfer relays, isolators, phase selector, loop amplifiers, conflict monitor, etc.) fully bench- <br /> tested by WSDOT and furnished by the Owner. Controller, software and programming necessary to make <br /> the traffic signal operational will also be provided by WSDOT forces. <br /> The Contracting Agency-supplied materials will be installed by the Contractor on the existing controller <br /> cabinet foundation. The Contractor shall notify the Engineer three working days in advance of the date <br /> Contracting Agency-supplied materials are required. The Contractor will terminate existing and new wiring <br /> in the controller cabinet. <br /> Upon request, the Contracting Agency will provide access to the material storage location at WSDOT <br /> facilities. The Contractor will transport materials from their storage location to the specific installation <br /> location. The Contractor will be responsible for including all costs associated with transporting and <br /> installing the Contracting Agency-furnished items. The Contractor shall be responsible for protection of <br /> these items until they are fully installed. <br /> The Contracting Agency will procure through Snohomish County the following materials for the bid item, "SR 527 <br /> at 208th Street SE (SR 524) Temporary Traffic Signal Systems, Complete" <br /> Description <br /> Two Rainbow Camera and lens complete in Housing <br /> Two Pole Mounting Hardware Kit <br /> Contracting Agency supplied materials shall be scheduled for pickup through the Traffic Operations <br /> Supervisor during normal working hours between 7:00 a.m. and 2:30 p.m., at the following address: <br /> Snohomish County Public Works Cathcart Maintenance Center (PWCMC) <br /> 8915 Cathcart Way <br /> Snohomish,WA 98296 <br /> 4 <br /> Swift it BRT Boeing to Canyon Park Station--Traffic Signal 90%Special Provisions— 12/1/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.