My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-20.3(11) Testing <br /> Section 8-20.3(11)is supplemented with the following: <br /> Traffic Signal Turn-on <br /> Prior to a Traffic Signal Turn-on event, the Contractor shall conduct a Pre Turn-on coordination meeting. The Pre- <br /> Turn On Coordination Meeting is required a minimum of fourteen (14) calendar days prior to turn on for all <br /> Temporary and Permanent Signal Systems. These include the sys The turn on schedule and date shall be arranged <br /> and confirmed at the meeting. All functional tests and other tests required by the Contract Specifications shall be <br /> completed to the satisfaction of the Engineer 48 hours prior to the turn on date. The Contractor shall provide the <br /> Engineer a minimum of 5 days written notice of the proposed Pre Turn-on coordination meeting date and time. <br /> For traffic signals operated by WSDOT, the Pre-Turn on Coordination Meeting shall include invitations to the <br /> following personnel included as invited attendees: <br /> ***(To Be Determined)*** <br /> Project Engineer <br /> Project Chief Inspector <br /> Electrical Inspector <br /> Signal Operations Engineer <br /> Signal Maintenance Technician <br /> Designated City Staff (Mill Creek) <br /> For traffic signals operated by Snohomish County, the Pre-Turn on Coordination Meeting shall include invitations <br /> to the following personnel included as invited attendees: <br /> ****(To Be Determined)**** <br /> Project Engineer <br /> Project Chief Inspector <br /> Electrical Inspector <br /> Signal Operations Engineer <br /> Signal Maintenance Technician <br /> Designated City Staff (Bothell, Everett) <br /> Prior to the Pre Turn-on coordination meeting, the Contractor shall complete the items of work detailed in the <br /> "Traffic Signal Turn-on Checklist" and submit the completed checklist to the Engineer. The Traffic Signal Turn-on <br /> Checklist form will be furnished to the Contractor by the Engineer. <br /> 19 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />