Laserfiche WebLink
Item 6 is supplemented as follows: <br /> Loop installation shall not take place in temperatures below 40°F. <br /> Item 7 is supplemented as follows: <br /> The sawcuts shall be of uniform depth and any sharp edges, abrasions, or ridges shall be removed prior to <br /> placing the wire. <br /> Sawcut Cleaning <br /> The high pressure washer shall operate at 1000 psi minimum pressure as certified by the manufacturer's <br /> label on the machine or as measured by an in line pressure gauge. <br /> All requirements of Section 1-07.15, "Temporary Water Pollution/Erosion 34 Control" shall be observed as <br /> specified in the Contract and in the Plans when the sawcut cleaning is performed. <br /> Item 11 is supplemented as follows: <br /> Loop detector sealant shall conform to one of the following specifications, chosen based on Case A or Case <br /> B application: <br /> Case A <br /> Induction Loop Detectors installed and sealed into the finish lift of asphalt shall conform to these criteria: <br /> TEST PARAMETER SPECIFICATION LIMITS <br /> Safe Heating Temperature 410° F <br /> Pour Temperature 38° F <br /> Penetration, 77° F, 6 oz, 5 sec. 10-25 dmm <br /> Penetration, 126 degrees F, 2 oz, 5 sec. 50 dmm max. <br /> Softening Point degrees F 410°F min <br /> Ductility, 125°F,in. 6°F min. <br /> Mandrel Bend, 0°F, 90°, <br /> 10 sec., 1/2 " diameter <br /> Pass 2of 3 <br /> Case B <br /> Induction Loop Detectors installed and sealed into the pavement surface prior to finish lift of asphalt (or <br /> into a paving course which is to be resurfaced within one year) shall conform to this criteria: <br /> TEST PARAMETER SPECIFICATION LIMITS <br /> Safe Heating Temperature 421°F <br /> Pour Temperature 390°F max. <br /> 21 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />