Laserfiche WebLink
accommodate changes in lane configuration and traffic flow during construction as part of this item of <br /> work. The turn on of the temporary signal and illumination system shall comply with Section 8-20.3(11) of <br /> these Special Provisions. <br /> 29 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />