Laserfiche WebLink
DIVISION 9 <br /> MATERIALS <br /> 9-29 Illumination, Signal,Electrical <br /> Section 9-29 is supplemented with the following general requirement: <br /> The Work will be conducted within multiple jurisdictions. The Contractor shall comply with the specific <br /> requirements of each agency, as described in the Plans and specified in these Special Provisions. <br /> Special Provisions for Division 9-29 are divided into two subsections. These subsections are as follows: <br /> 9-29 (PART A) — Illumination, Signal, Electrical - These Special Provisions are based on Snohomish <br /> County requirements and apply to all work completed within the City of Bothell and the City of Everett, <br /> for the following bid items: <br /> "SR 527 at 208th Street SE (SR 524) Temporary Traffic Signal System, Complete." <br /> "SR 527 at 208th Street SE (SR 524) Traffic Signal Modifications, Complete." <br /> "Airport Road at SR 99 (Evergreen Way) Traffic Signal Modifications, Complete." <br /> "Airport Road at 112th Street SW Traffic Signal Modifications, Complete." <br /> "Airport Road at Kasch Park Road Traffic Signal Modifications, Complete." <br /> "Airport Road BAT Lane Illumination System, Complete" <br /> 9-29 (PART B) — Illumination, Signal, Electrical - These Special Provisions are based on WSDOT <br /> Northwest Region requirements and apply to all work completed on the following bid items: <br /> "SR 527 at 196th Street SE Traffic Signal Modifications, Complete." <br /> "SR 527 at 164th Street SE Temporary Traffic Signal System, Complete." <br /> "SR 527 at 164th Street SE Traffic Signal Modifications, Complete." <br /> "SR 527 at 153t Street SE Traffic Signal Modifications, Complete." <br /> "SR 96 (132nd Street SE) at 16th Avenue SE Traffic Signal Modifications, Complete." <br /> "SR 96 (132nd Street SE) at Dumas Road/Elgin Road Traffic Signal Modifications, Complete." <br /> 30 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />