Laserfiche WebLink
F <br /> PLANS, SPECIFICATIONS AND ESTIMATE REVIEW <br /> Project Title: <br /> CT SWIFT II BRT— Boeing to Canyon Park Stations 60% Review <br /> Job Charge: Reviewed By: Office&Mail Stop: Phone: Date: Sh <br /> WO# Euneka Richards Traffic Operations 425-257-8926 8-2-16 3 or, . <br /> # Sht/Pg Reviewer's Comment Designer's Response Init. <br /> The Corridor Stations plans submitted are consistent with our discussions <br /> 12 From with Community Transit, and we have agreed to allow them to relocate some The Swift II project will construct bus Otak <br /> Everett of our existing stops in order to accommodate the new Swift stations. Those boarding pads and relocate the existing <br /> Transit stops include: _ Everett Transit flags at the 4 local stop <br /> (Sabina locations. The boarding pads and <br /> Popa) -Airport Rd at SR 99 northbound relocated signs will be shown in the 90% <br /> -Airport Rd at 112th St SW, northbound and southbound Plans for review/approval by the City of <br /> -Airport Rd at Kasch Park Rd, southbound Everett and Everett Transit. <br /> It may be just a matter of labeling in the documents provided, but the first <br /> stop is called out as "Relocate local existing stop", and the last three are <br /> called out as"Everett Transit to relocate". I just want to make sure that they <br /> are consistent in the planning process. Our understanding is that we will <br /> work with the City's traffic engineering department to assess the best place <br /> to relocate those four stops, and that Community Transit will manage their <br /> actual move and that will be included as part of the construction process. <br /> Please confirm that CT will be relocating the Everett Transit stops for all 4 <br /> locations within this project. <br /> 13 C3.27 Consider deleting 2nd "BUS ONLY," probably not needed after bus stop for Deletion will be considered. Proposed Otak <br /> SWIFT. channelization is being coordinated with <br /> WSDOT for consistency along the entire <br /> corridor. The channelization at this <br /> station will be revised to be consistent <br /> with other Swift II stations. <br /> 14 C3.27 City of Everett does not use arrows for bike symbols, but should coordinate Noted. Will coordinate with Snohomish Otak <br /> C3.33 with Snohomish County so corridor is the same. County to ensure corridor has the <br /> consistent bike symbols at 90%. <br /> 15 C3.27 Move "BUS ONLY" marking to stop location. See response for Comment#13. Otak <br /> C3.29 <br /> 16 C3.27 Right turn arrow into driveway not needed. Noted. Arrow will be removed at 90%. Otak <br /> Swift II BRT Everett Comment Sheet_60 Stations_OtakResponse.docx <br />