My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-10.5 Payment <br /> Section 1-10.5 is supplemented with the following: <br /> "Uniformed Officers", per hour. <br /> "Portable Changeable Message Sign", per day. <br /> The unit Contract price for"Uniformed Officers" and "Portable Changeable Message Signs" shall <br /> be full compensation for all costs of labor, materials, and equipment incurred by the Contractor <br /> in performing the Contract Work for these items. <br /> All costs of preparation, submittal, revisions, and approval of site specific Traffic Control Plans <br /> and Detour Plans will be considered incidental to the lump sum contract payment for"Project <br /> Temporary Traffic Control". <br /> All costs of furnishing, installing, and maintaining Business Open Signage as noted in 1-07.23(1) <br /> of these Special Provisions will be considered incidental to the lump sum contract payment for <br /> "Project Temporary Traffic Control". <br /> END OF DIVISION 1 <br /> Swift Green Line—Corridor Stations Special Provisions SP69 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.