My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following new section: <br /> 2-02.3(4) Sawcutting <br /> Where sawcutting is required, the sawcut shall be three inches deep, minimum. Where the <br /> existing pavement is more than three inches thick, the portion below the top three inches may <br /> be broken after the sawcut is made. Sawcuts shall be cleaned by the use of high pressure water <br /> (1,400 psi or greater), or another method as approved by the Engineer. <br /> Care shall be taken to prevent damage to the existing pavement specified to remain.All damage <br /> to existing pavement specified to remain shall be repaired in accordance with Section 1-07.13. <br /> The Contractor shall perform all sawcutting work, including all containment, collection and <br /> disposal of sawcutting debris and wastewater, in accordance with Section 1-07.5(3) as <br /> supplemented in these Special Provisions. <br /> 2-02.4 Measurement <br /> Supplement this section with the following: <br /> Sawcutting will be measured by the linear foot of sawcut, along the line and grade of the sawcut <br /> and the limits of the sawcut as shown in the Plans. <br /> 2-02.5 Payment <br /> Supplement this section with the following: <br /> "Sawcutting", per linear foot. <br /> The unit contract price per linear foot for"Sawcutting" shall be full pay for performing the work <br /> as specified, including containment, collection, and disposal of all sawcutting debris and <br /> wastewater. <br /> Payment for Sawcutting will be made for the original sawcut. No additional payment will be <br /> made for fresh sawcuts made to replace damaged or raveled edges. Payment per linear foot <br /> shall include all sawcutting regardless of depth or type of material cut. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.3(14)J Gravel Borrow Including Haul <br /> This Section is supplemented with the following: <br /> Gravel borrow shall be furnished, placed and compacted to the limits as specified on the Plans <br /> or as directed by the Engineer. Gravel borrow shall be compacted by Method C of Section 2- <br /> 03.3(14)C of the Standard Specifications. Compaction shall be considered incidental to the unit <br /> contract price. <br /> Swift Green Line—Corridor Stations Special Provisions SP71 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.