2-03.5 Payment <br /> This Section is supplemented with the following: <br /> Measurement for roadway excavation and embankment will be based on the original ground <br /> elevations recorded previous to the award of this contract. <br /> Contractor shall notify the engineer immediately if discrepancies are discovered in the ground <br /> elevations which will materially affect the quantities of earthwork. If, in the determination of the <br /> engineer, significant discrepancies are revealed, the original computations of earthwork <br /> quantities will be adjusted accordingly. <br /> Earthwork quantities have been computed, either manually or by means of electronic data <br /> processing equipment, by use of the average end area method or by the finite element analysis <br /> method utilizing digital terrain modeling techniques. <br /> 2-06 SUBGRADE PREPARATION <br /> 2-06.3 Construction Requirements <br /> Add the following new section: <br /> 2-06.3(3) Subgrade for Permeable Pavements <br /> (March 9, 2016 APWA GSP) <br /> Before placing permeable ballast for Porous HMA/WMA, the Contractor shall bring the <br /> Subgrade to the required line, grade, and cross-section. The Contractor shall compact the <br /> Subgrade to a depth of 6 inches to at least 90 percent, but not more than 92 percent, of the <br /> maximum density as determined by the compaction control tests described in Section 2- <br /> 03.3(14)D. Two (2) density tests will be conducted for every 5,000 square feet of prepared <br /> subgrade; or four(4)tests per 200 lineal feet of roadway or sidewalk. All subgrade shall be <br /> firm and unyielding as determined by the Engineer. <br /> The Contractor shall take measures to protect the prepared and approved subgrade from <br /> traffic, water run-on, standing water, or other damage. Subgrade that has been over <br /> compacted, shall be scarified to a minimum depth of eight(8) inches and recompacted. <br /> Material used to protect the Subgrade from traffic or provide access to adjacent facilities <br /> shall be removed and the subgrade compacted prior to placing geotextile, if used and/or <br /> permeable ballast. <br /> 2-06A Measurement and Payment <br /> (March 9, 2016 APWA GSP) <br /> Supplement this section with the following: <br /> Measurement for Subgrade for Permeable Pavement will be in accordance with 2-06.5. <br /> Swift Green Line—Corridor Stations Special Provisions SP72 <br /> May 2017 <br />