My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2-09 STRUCTURE EXCAVATION <br /> 2-09.4 Measurement <br /> Revise this section with the following: <br /> No specific unit of measurement shall apply to the lump sum item of Shoring or Extra <br /> Excavation Class B. <br /> Structure Excavation will not be measured for payment. <br /> 2-09.5 Payment <br /> Revise this section with the following: <br /> Structure Excavation, Class A, including but not limited to, excavation, stockpile, backfill <br /> compaction, loading, hauling, and disposal costs, shall be included in the various related <br /> footings, retaining walls and storm drainage structures bid items included in the proposal, and <br /> no additional payment will be made. <br /> Structure Excavation, Class B, including but not limited to, excavation, stockpile, backfill <br /> compaction, loading, hauling, and disposal costs, shall be included in the various related storm <br /> drainage bid items included in the proposal, and no additional payment will be made. For pipe <br /> diameters 24" and under, including any affected catch basins, inlets or manholes, the Engineer <br /> reserves the right to deviate up to three (3) feet in any direction from the plan elevation or <br /> location without any adjustment in the unit price or any additional compensation to the <br /> Contractor. <br /> "Shoring or Extra Excavation Class B", lump sum. <br /> The lump sum contract price for Shoring or Extra Excavation Class B shall be full pay for all <br /> excavation, backfill, compaction and other Work required when extra excavation is used in lieu <br /> of constructing shoring. If select backfill material is required for backfilling within the limits of the <br /> Structure excavation, it shall also be required as backfill material for the extra excavation at the <br /> Contractor's expense. <br /> The paragraph beginning "If there is no Bid item for shoring..." is deleted. <br /> END DIVISION 2 <br /> Swift Green Line—Corridor Stations Special Provisions SP73 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.