2-09 STRUCTURE EXCAVATION <br /> 2-09.4 Measurement <br /> Revise this section with the following: <br /> No specific unit of measurement shall apply to the lump sum item of Shoring or Extra <br /> Excavation Class B. <br /> Structure Excavation will not be measured for payment. <br /> 2-09.5 Payment <br /> Revise this section with the following: <br /> Structure Excavation, Class A, including but not limited to, excavation, stockpile, backfill <br /> compaction, loading, hauling, and disposal costs, shall be included in the various related <br /> footings, retaining walls and storm drainage structures bid items included in the proposal, and <br /> no additional payment will be made. <br /> Structure Excavation, Class B, including but not limited to, excavation, stockpile, backfill <br /> compaction, loading, hauling, and disposal costs, shall be included in the various related storm <br /> drainage bid items included in the proposal, and no additional payment will be made. For pipe <br /> diameters 24" and under, including any affected catch basins, inlets or manholes, the Engineer <br /> reserves the right to deviate up to three (3) feet in any direction from the plan elevation or <br /> location without any adjustment in the unit price or any additional compensation to the <br /> Contractor. <br /> "Shoring or Extra Excavation Class B", lump sum. <br /> The lump sum contract price for Shoring or Extra Excavation Class B shall be full pay for all <br /> excavation, backfill, compaction and other Work required when extra excavation is used in lieu <br /> of constructing shoring. If select backfill material is required for backfilling within the limits of the <br /> Structure excavation, it shall also be required as backfill material for the extra excavation at the <br /> Contractor's expense. <br /> The paragraph beginning "If there is no Bid item for shoring..." is deleted. <br /> END DIVISION 2 <br /> Swift Green Line—Corridor Stations Special Provisions SP73 <br /> May 2017 <br />