Laserfiche WebLink
8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES <br /> 8.06.2 Materials <br /> Section 8-06.2 is supplemented with the following: <br /> Cement concrete driveway entrances shall be constructed of high early-strength concrete; <br /> obtain a minimum compressive strength of 2,500 psi within 48 hours of placement and 4,000 psi <br /> by 28 days. <br /> 8-06.3 Construction Requirements <br /> Section 8-06.3 is supplemented with the following: <br /> Local/business access shall be maintained at all times unless otherwise permitted by the <br /> Engineer and advanced notification to property owners is provided. It may be necessary for the <br /> contractor to pour driveways in multiple segments and/or construct temporary widening to <br /> provide access to adjacent properties/businesses during driveway construction. <br /> 8-06.4 Measurement <br /> Section 8-06.4 is supplemented with the following: <br /> Cement Concrete Type 1 Drop Curb Driveway will be measured by the square yard of finished <br /> surface. <br /> 8-06.5 Payment <br /> Section 8-06.5 is supplemented with the following: <br /> "Cement Concrete Type 1 Drop Curb Driveway", per square yard. <br /> "Precast Concrete Wheel Stop", per each. <br /> The unit contract price per each for "Precast Concrete Wheel Stop" shall include furnishing, <br /> installing, and placement per manufacturer's requirements at the locations shown in the plans. <br /> 8-07 PRECAST TRAFFIC CURB <br /> 8-07.1 Description <br /> Section 8-07.1 is supplemented with the following: <br /> This Work also includes furnishing and installation of pre-cast concrete wheel stops at the <br /> locations shown in the Plans. <br /> 8-07.2 Materials <br /> Section 8-07.2 is supplemented with the following: <br /> Precast Concrete Wheel Stop <br /> Wheel stops shall be 6 feet in length, pre-cast, constructed of 5000 psi air-entrained concrete, <br /> reinforced with two (2) No. 4 reinforcing bar, and constructed with tapered sides. <br /> Swift Green Line—Corridor Stations Special Provisions SP109 <br /> May 2017 <br />