8-07.4 Measurement <br /> Section 8-07.4 is supplemented with the following: <br /> Precast Concrete Wheel Stop per each. <br /> 8-07.5 Payment <br /> Section 8-07.5 is supplemented with the following: <br /> "Precast Concrete Wheel Stop", per each. <br /> The unit contract price per each for "Precast Concrete Wheel Stop" shall include furnishing, <br /> installing, and placement per manufacturer's requirements at the locations shown in the plans. <br /> 8-14 CEMENT CONCRETE SIDEWALKS <br /> 8-14.1 Description <br /> Section 8-14.1 is supplemented with the following: <br /> This Work shall also include constructing Cement Concrete Sidewalk at traffic island, Cement <br /> Concrete Stairs including Handrail, and cement concrete pad for propane tank including bollard <br /> reinstallation per the details shown in the Plans. <br /> 8-14.3 Construction Requirements <br /> Section 8-14.3 is supplemented with the following: <br /> (April 4, 2011 WSDOT GSP) <br /> The Contractor shall request a pre-meeting with the Engineer to be held 2 to 5 working days <br /> before any work can start on cement concrete sidewalks, curb ramps or other pedestrian access <br /> routes to discuss construction requirements. Those attending shall include: <br /> 1. The Prime Contractor and Subcontractor in charge of constructing forms, and placing, <br /> and finishing the cement concrete. <br /> 2. Project Engineer(or representative) and Project Inspectors for the cement concrete <br /> sidewalk, curb ramp or pedestrian access route Work. <br /> Items to be discussed in this meeting shall include, at a minimum, the following: <br /> 1. Slopes shown on the Plans. <br /> 2. Inspection <br /> 3. Traffic control <br /> 4. Pedestrian control, access routes and delineation <br /> 5. Accommodating utilities <br /> 6. Form work <br /> 7. Installation of detectable warning surfaces <br /> Supplement this section with the following: <br /> The Contractor shall notify the Engineer when curb ramps have been formed and at least 24 <br /> hours prior to concrete being poured. The Contractor shall receive approval from the <br /> Engineer prior to pouring curb ramps. The Engineer's approval of the ramp layout does not <br /> Swift Green Line—Corridor Stations Special Provisions SP110 <br /> May 2017 <br />