My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
constitute final acceptance of the ramps. Final acceptance of the ramps will be given after <br /> the concrete finish work had been completed. <br /> The Contractor is made aware that ANY: non-ADA compliant slopes, widths, vertical surface <br /> blemishes or discontinuities over 1/4-inch, grade breaks within specific ramp components, <br /> joints that are not square, or any other feature that does not meet ADA compliance will <br /> constitute a basis for removal and replacement of the curb ramp, including the curb and <br /> gutter, at the Contractor's expense. <br /> 8-14.3(4) Curing <br /> Section 8-14.3(4) is supplemented with the following: <br /> It shall be the Contractor's responsibility to watch over curing concrete until it is set to prevent <br /> vandalism.Any repairs needed to correct vandalism during the initial set period, including full <br /> replacement of the damaged panel, shall be at the expense of the Contractor and subject to <br /> approval of the Engineer. <br /> 8-14..3(3) Placing and Finishing Concrete <br /> Section 8-14.3(3) is supplemented with the following: <br /> White pigment curing compounds will not be allowed. Curing shall be achieved by covering the <br /> sidewalk with white polyethylene sheeting for a minimum of three days or by the placement of <br /> an approved clear concrete curing compound. <br /> Sidewalk surfaces, damaged by improperly placed polyethylene sheeting or placement of <br /> concrete during inclement weather, shall be removed and replaced at the Contractor's expense. <br /> Section 8-14.3 is supplemented with the following: <br /> 8-14.3(6) Cement Concrete Stairs and Handrail <br /> Cement concrete stairs including handrail shall be constructed per the details in the Plans. <br /> 8-14.4 Measurement <br /> This Section is supplemented with the following: <br /> Cement Concrete Stairs Including Handrail will be measured per each complete installation. <br /> 8-14.5 Payment <br /> This Section is supplemented with the following: <br /> The unit price for"Cement Conc. Curb Ramp Type_" shall include all costs to furnish and <br /> install detectable warning surface and pedestrian curb at the plan locations and as shown in the <br /> Plan Details and Standard Plans. <br /> Detectable warning surface, pedestrian curb, and stamped concrete outside of curb ramp areas <br /> shall) be incidental to the unit bid price for"Cement Concrete Sidewalk"where installation is <br /> shown in the Plans. <br /> Swift Green Line—Corridor Stations Special Provisions SP111 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.