Laserfiche WebLink
constitute final acceptance of the ramps. Final acceptance of the ramps will be given after <br /> the concrete finish work had been completed. <br /> The Contractor is made aware that ANY: non-ADA compliant slopes, widths, vertical surface <br /> blemishes or discontinuities over 1/4-inch, grade breaks within specific ramp components, <br /> joints that are not square, or any other feature that does not meet ADA compliance will <br /> constitute a basis for removal and replacement of the curb ramp, including the curb and <br /> gutter, at the Contractor's expense. <br /> 8-14.3(4) Curing <br /> Section 8-14.3(4) is supplemented with the following: <br /> It shall be the Contractor's responsibility to watch over curing concrete until it is set to prevent <br /> vandalism.Any repairs needed to correct vandalism during the initial set period, including full <br /> replacement of the damaged panel, shall be at the expense of the Contractor and subject to <br /> approval of the Engineer. <br /> 8-14..3(3) Placing and Finishing Concrete <br /> Section 8-14.3(3) is supplemented with the following: <br /> White pigment curing compounds will not be allowed. Curing shall be achieved by covering the <br /> sidewalk with white polyethylene sheeting for a minimum of three days or by the placement of <br /> an approved clear concrete curing compound. <br /> Sidewalk surfaces, damaged by improperly placed polyethylene sheeting or placement of <br /> concrete during inclement weather, shall be removed and replaced at the Contractor's expense. <br /> Section 8-14.3 is supplemented with the following: <br /> 8-14.3(6) Cement Concrete Stairs and Handrail <br /> Cement concrete stairs including handrail shall be constructed per the details in the Plans. <br /> 8-14.4 Measurement <br /> This Section is supplemented with the following: <br /> Cement Concrete Stairs Including Handrail will be measured per each complete installation. <br /> 8-14.5 Payment <br /> This Section is supplemented with the following: <br /> The unit price for"Cement Conc. Curb Ramp Type_" shall include all costs to furnish and <br /> install detectable warning surface and pedestrian curb at the plan locations and as shown in the <br /> Plan Details and Standard Plans. <br /> Detectable warning surface, pedestrian curb, and stamped concrete outside of curb ramp areas <br /> shall) be incidental to the unit bid price for"Cement Concrete Sidewalk"where installation is <br /> shown in the Plans. <br /> Swift Green Line—Corridor Stations Special Provisions SP111 <br /> May 2017 <br />