Laserfiche WebLink
Cement concrete pad for propane tank will be measured and paid as "Cement Concrete <br /> Sidewalk." Reinstallation of existing bollards at new concrete pad shall be incidental to the unit <br /> bid price for"Cement Concrete Sidewalk". Propane tank relocation will be by others. <br /> "Cement Concrete Stairs Including Handrail", per each. <br /> All costs in connection with constructing the cement concrete stairs per the details in the Plans <br /> including handrail shall be included in the unit Contract price per each. <br /> 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT <br /> TRANSPORTATION SYSTEMS, AND ELECTRICAL <br /> 8-20.1 Description <br /> Delete Section 8-20.1 and replace with the following: <br /> This Work consists of furnishing, installing and field testing all materials and equipment <br /> necessary to complete in place, fully functional systems listed below, including modifications to <br /> existing systems and maintaining existing connection to Snohomish County PUD-owned power <br /> sources all in accordance with approved methods, the Plans, the Specifications and <br /> Amendments, and these Special Provisions. <br /> "SR 527 at 208th Street SE (SR 524)Temporary Traffic Signal System, Complete." <br /> "SR 527 at 208th Street SE (SR 524)Traffic Signal Modifications, Complete." <br /> "SR 527 at 196th Street SE Traffic Signal Modifications, Complete." <br /> "SR 527 at 164th Street SE Temporary Traffic Signal System, Complete." <br /> "SR 527 at 164th Street SE Traffic Signal Modifications, Complete." <br /> "SR 527 at 153rd Street SE Traffic Signal Modifications, Complete." <br /> "SR 96 (132nd Street SE) at 16th Avenue SE Traffic Signal Modifications, Complete." <br /> "SR 96 (132nd Street SE) at Dumas Road/Elgin Road Traffic Signal Modifications, <br /> Complete." <br /> "Airport Road at SR 99 (Evergreen Way)Traffic Signal Modifications, Complete." <br /> "Airport Road at 112th Street SW Traffic Signal Modifications, Complete." <br /> "Airport Road at Kasch Park Road Traffic Signal Modifications, Complete." <br /> "Airport Road BAT Lane Illumination System, Complete" <br /> Unless otherwise noted, the location of signals, controllers, standards, and appurtenances <br /> shown in the Plans are approximate; and the exact location will be established by the Engineer <br /> in the field. <br /> Swift Green Line—Corridor Stations Special Provisions SP112 <br /> May 2017 <br />