My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Cable specifications (to the extent known, or currently labeled) <br /> 4. As-Built Records (In accordance with the Special Provisions) <br /> 5. Power Meter test results <br /> 6. Copy of the manufacturer and model number of the test equipment along <br /> with certification that the power meter has been calibrated within 12 <br /> months of the proposed test dates (previously submitted to the <br /> Engineer). <br /> 8-20.3(13) Illumination Systems <br /> Delete the 7th and 8th paragraphs of Section 8-10.3(13) and replace with the following: <br /> All new Snohomish County light standards shall have an approved metal tag riveted to the pole <br /> within 6" above the handhole on the pole shaft. Text shall be a minimum of 3/16" high, stamped <br /> or embossed. The information provided on the tag shall be as noted on the approved shop <br /> drawings, and will include the following: <br /> STD. No. XX—(Per the Plans) <br /> INTERSECTION —(AIRPORT ROAD & SR 99) <br /> MANUFACTURER <br /> APPROVED DWG XXXXXX—(Approved Drawing No.) <br /> Fab. XX/XX/)(XXX— Fabrication Date <br /> 8-20.3(13)C Luminaires <br /> Section 8-20.3(13)C is supplemented with the following: <br /> Relocate Existing Luminaire- Cobra Heads <br /> Construct foundation for relocated steel light standard with slip base for a Type A foundation per <br /> WSDOT Standard Plan J-28.30-03. Potholing is required prior to excavation if any utilities are <br /> within 10 feet. Contractor shall verify existing bolt pattern and make modifications as necessary <br /> prior to concrete installation. Verify existing lighting circuits, and break existing splices at the <br /> junction box. Remove and relocate existing luminaire to new foundation. Install new junction <br /> box, remove and replace affected lighting circuit wiring and conduit in kind. Reroute conduits <br /> and wiring, and resplice conductors at the new junction box. Remove the existing foundation, <br /> junction box, conduit bends, elbows, and obsolete conduit completely. <br /> Relocate Pedestrian Scale Lighting & Private Parking Lot Lighting <br /> Contractor shall determine existing anchor bolt type, size, and pattern; existing foundation size <br /> and depth; luminaire type, fixture type, wattage, operating voltage, and mounting height. Provide <br /> this information along with the proposed foundation design and materials for approval prior to <br /> commencing luminaire relocation work. For available Geotechnical information, see Appendix <br /> E. Construct approved foundation in proposed new location. Potholing is required prior to <br /> excavation if any utilities are within 10 feet. Verify existing lighting circuits. Remove and <br /> relocate existing luminaire to new foundation. Remove and replace affected lighting circuit <br /> wiring, conduits and handholes in kind to completely restore the lighting circuit. Remove the <br /> existing foundation,junction box, conduit bends, elbows, and obsolete conduit completely. <br /> 8-20.3(14) Signal Systems <br /> Section 8-20.3(14) is revised as follows: <br /> 8-20.3(14) Signal Systems (PART A) These Special Provisions are based on <br /> Snohomish County requirements and apply to all work completed within the City of <br /> Swift Green Line—Corridor Stations Special Provisions SP132 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.