My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following new section: <br /> 8-26 PEDESTRIAN HANDRAIL NEW <br /> 8-26.1 Description <br /> This work shall consist of the furnishing and installation of pedestrian handrail at the locations <br /> shown in the Plans. <br /> 8-26.2 Materials <br /> Pedestrian handrail shall be per Snohomish County or Mill Creek standard details as applicable. <br /> 8-26.4 Measurement <br /> Pedestrian handrail will be measured per linear foot. <br /> 8-26.5 Payment <br /> Payment will be made in accordance with Section 1-04.1 for the following bid items: <br /> "Pedestrian Handrail", per linear foot. <br /> The unit contract price for "Pedestrian Handrail" shall be full compensation for all labor, <br /> materials, tools and equipment necessary to furnish and install the handrail as specified. <br /> Add the following new section: <br /> 8-30 STATION FOUNDATIONS, PLATFORM AND PLATFORM CURB NEW <br /> 8-30.1 Description <br /> This Work includes cast-in-place concrete for foundations, vertical curb, and platform for <br /> Stations, including reinforcement, concrete materials, mix design, placement procedures, and <br /> finishes shown in the plans. <br /> This Work also includes: <br /> • Installation of joint fillers and sealing compounds for expansion joints, isolation joints, <br /> control joints, and contraction joints in concrete as indicated. <br /> • Installation of cast-in-place composite detectable warning paver strip on Station platform. <br /> • Installation of Station platform boarding area graphics. <br /> 8-30.2 Materials <br /> Concrete for Foundations, Retaining Walls, Vertical Curb, and Platform for Stations <br /> A. Cast-in-place concrete for foundations, vertical curb, and platform for Stations shall have <br /> a compressive strength (28 Days) of 4000 PSI (Class 4000) <br /> Swift Green Line—Corridor Stations Special Provisions SP143 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.