Laserfiche WebLink
8-30.5 Payment <br /> Payment will be made in accordance with Section 1-04.1, for each of the following bid items that <br /> are included in the proposal: <br /> "Reinforced Cement Concrete Station Platform at 16th Southbound/Eastbound, Complete", per <br /> each. <br /> "Reinforced Cement Concrete Station Platform, Complete", per each. <br /> The unit contract price per each for"Reinforced Cement Concrete Station Platform, Complete" <br /> and "Reinforced Cement Concrete Station Platform at 16th Southbound/Eastbound, Complete", <br /> shall be full compensation for the installation of the reinforced cement concrete station platform <br /> as shown in the plans and described in the specifications including tactile strip, platform <br /> boarding area graphics, jointing, and sealing. <br /> Platform Ramps will be measured and paid as "Cement Concrete Sidewalk". <br /> Add the following new section: <br /> 8-31 STATION SHELTER AND AMENTITIES INSTALLATION NEW <br /> 8-31.1 Description <br /> This Work includes installation of owner furnished Station shelters and amenities at the locations <br /> shown in the Plans including: <br /> • Installation of owner furnished Station Shelters and Iconic Markers including <br /> foundations, columns and beams, outrigger arms and glass roof, and cladding; shelter <br /> and Iconic Marner lighting; benches, and windscreens with leaning rail; and passenger <br /> information panel and load center. <br /> • Installation of owner furnished site furnishings including windscreens, benches, and litter <br /> bins. <br /> • Installation of owner furnished barrier railing and boundary railing for Stations. <br /> • Installation of owner furnished passenger fare collection equipment including Ticket <br /> Vending Machines and Stand Alone Fare Transaction Processors. <br /> A. Ticket Vending Machine (TVM): Parkeon Strada BNA Ticket Vending Machine <br /> B. Stand Alone Fare Transaction Processors (SAFTP): ERG ORCA Scanner and <br /> Wall Mounting Bracket <br /> Coordinate with Community Transit and Vendors to complete commissioning. <br /> • Installation of owner furnished station signage including station name signage and rider <br /> alert brackets. <br /> A. Station Name Signage: Future Systems aluminum plate cut-out station <br /> identification sign installed on the road-side face of the station identifier box. <br /> B. Rider Alert Bracket: Next Level Signs Slide in Graphic Bracket with 1-inch Rail <br /> and Security Screw. One each per shelter- 8.5-inch x 11-inch and 8.5-inch x 14- <br /> inch. <br /> This Work also includes the relocation of existing local bus shelters and trash cans to new <br /> locations as shown in the Plans. <br /> Swift Green Line—Corridor Stations Special Provisions SP149 <br /> May 2017 <br />