Laserfiche WebLink
E. Test each GFCI receptacle device for proper operation. <br /> ADJUSTING <br /> A. Adjust devices and wall plates to be flush and level. <br /> CLEANING <br /> A. Clean exposed surfaces to remove splatters and restore finish. <br /> INTERIOR LIGHTING <br /> REFERENCE STANDARDS <br /> A. ANSI C78.379-American National Standard for Electric Lamps-- Reflector Lamps-- <br /> Classification of Beam Patterns; 2006. <br /> B. ANSI C82.1 -American National Standard for Lamp Ballast- Line Frequency Fluorescent <br /> Lamp Ballast; 2004. <br /> C. ANSI C82.4-American National Standard for Ballasts for High-Intensity-Discharge and <br /> Low Pressure Sodium Lamps (Multiple-Supply Type); 2002. <br /> D. NECA/IESNA 500- Standard for Installing Indoor Commercial Lighting Systems; National <br /> Electrical Contractors Association; 2006. <br /> E. NECA/IESNA 502 - Standard for Installing Industrial Lighting Systems; National Electrical <br /> Contractors Association; 2006. <br /> F. NEMA WD 6-Wiring Devices - Dimensional Requirements; National Electrical <br /> Manufacturers Association; 2002. <br /> G. NFPA 70- National Electrical Code; National Fire Protection Association; 2008. <br /> H. NFPA 101 - Code for Safety to Life from Fire in Buildings and Structures; National Fire <br /> Protection Association; 2006. <br /> QUALITY ASSURANCE <br /> A. Conform to requirements of NFPA 70 and NFPA 101. <br /> B. Manufacturer Qualifications: Company specializing in manufacturing the products <br /> specified in this section with minimum three years documented experience. <br /> C. Products: Listed and classified by Underwriters Laboratories Inc. as suitable for the <br /> purpose specified and indicated. <br /> INSTALLATION <br /> A. Install fixtures securely, in a neat and workmanlike manner, as specified in NECA 500 <br /> (commercial lighting). <br /> B. Locate recessed ceiling luminaires as indicated on reflected ceiling plan. <br /> C. Locate remote ballasts &emergency power supplies as directed. Provide supplemental <br /> wiring to fixtures. <br /> D. Install surface mounted luminaires plumb and adjust to align with building lines and with <br /> Swift Green Line—Corridor Stations Special Provisions SP179 <br /> May 2017 <br />