My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Add the following new section: <br /> 8-33 CANYON PARK P&R DRIVER RESTROOM BUILDING NEW <br /> 8-33.1 Description <br /> This Work includes furnishing and assembling new pre-engineered driver restroom building <br /> including foundation, services, and gutters and downspouts at Canyon Park Park & Ride as <br /> shown on the Plans and within these specifications. This work also includes the relocation of <br /> existing bike lockers outside of the new building footprint as shown on the Plans. <br /> 8-33.2 Materials <br /> Romtec 2024 Sierra II Compact Double Restroom with 8ft Storage/Mechanical Room — <br /> Customized for Owner as detailed/specified in Appendix H. No Substitutions. <br /> 8-33.3 Construction Requirements <br /> Pre-engineered driver restroom building shall be furnished and assembled per the details and <br /> specifications provided in Appendix H. <br /> 8-33.4 Measurement <br /> There will be no specific measurement for the lump sum bid item "Pre-Engineered Restroom <br /> Incl. Services". <br /> 8-33.5 Payment <br /> Payment will be made in accordance with Section 1-04.1, for each of the following bid items that <br /> are included in the proposal: <br /> "Pre-Engineered Restroom Incl. Services", per lump sum. <br /> The lump sum contract price for"Pre-Engineered Restroom Incl. Services shall be full <br /> compensation for furnishing and assembling the new driver restroom facility as shown in the <br /> plans and described in the specifications. <br /> All costs for building foundation, water and sewer connection to new driver restroom building, <br /> furnishing and installation of gutters and downspouts, and relocation of existing bike lockers will <br /> be considered incidental to the lump sum contract payment for"Pre-Engineered Restroom Incl. <br /> Services". <br /> END DIVISION 8 <br /> Swift Green Line—Corridor Stations Special Provisions SP187 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.