My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9-29.13(6) Emergency Preemption <br /> Section 9-29.13(6) is supplemented with the following: <br /> 9-29.13(6) Preemption: <br /> The system shall be capable of preempting the controller to the phases shown in the Plans <br /> when a signal is received from the field detector. <br /> Pre-emption equipment shall be either Opticom. <br /> Opticom <br /> If Opticom pre-emption equipment is used, the Contractor shall furnish and install the following: <br /> 1. Pre-emption detectors shall be Opticom Model 711. <br /> 2. Discriminators shall be four-channel model 454 units. One is required at each controller. <br /> In addition, where auxiliary Opticom pre-emption is used, the Contractor shall furnish <br /> and install the following: <br /> 3. A 757 auxiliary optical detector wiringharness where more than one detector is called for <br /> per channel. <br /> 4. A twelve position terminal block of the barrier type rated for 20A at 600 volts RMS <br /> minimum and meeting the requirements of Chapter 11 of the Type 170 Hardware <br /> Specification, FHWA IP-78-16 as currently amended. <br /> 9-29.13(10)C Adaptor Box <br /> ***To Be Determined if Needed*** <br /> The adaptor box shall be fabricated from .125-inch aluminum (5052 alloy), with mill finish. The <br /> cabinet shall not be anodized and the exterior shall not be painted. <br /> The Contractor shall verify foundation and cabinet dimensions and mounting bolt patterns prior <br /> to submitting shop drawings for the adaptor box to the Engineer. The shop drawings shall be <br /> submitted for approval 10 working days in advance of fabrication. <br /> The new controller cabinet, if Contracting Agency-supplied, will be available for bolt pattern <br /> verification as identified under the subsection, Contracting Agency-Supplied Materials of this <br /> provision. <br /> 9-29.15 Flashing Beacon Control <br /> Section 9-29.15 is supplemented with the following: <br /> Solid State Flasher <br /> The solid state flasher shall provide two output circuits to permit alternate flashing of signal <br /> faces. The flash rate shall be 55 flashes per minute ±10%. Duty cycle for each circuit shall be <br /> 50% on, 50% off±2%. <br /> Swift Green Line—Corridor Stations Special Provisions SP212 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.