My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 6/25/2019
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 6/25/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2021 11:46:47 AM
Creation date
6/28/2019 10:08:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
6/25/2019
Council Approval Date
5/15/2019
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Phil Johnson Ballfields Renovation
Tracking Number
0001860
Total Compensation
$3,847,270.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 12/2/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 6/21/2021 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Premier Field Development Inc. 9/28/2020 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ' Section 00 21 13 <br /> INSTRUCTIONS TO BIDDERS <br /> 4. Disqualification. Not be disqualified from bidding on any public works <br /> contract under RCW 39.06.010 or 39.12.065(3). <br /> 5. Apprentices. lithe Project is subject to the apprenticeship utilization <br /> requirements in RCW 39.04.320, not have been found out of compliance by <br /> the Washington state apprenticeship and training council for working <br /> apprentices out of ratio,without appropriate supervision, or outside their <br /> approved work processes as outlined in their standards of apprenticeship <br /> under chapter 49.04 RCW for the one-year period immediately preceding <br /> the date of the bid solicitation. <br /> 6. Compliance with Wage Statutes. Within the three-year period immediately <br /> preceding the date of the bid solicitation, not have been determined by a <br /> final and binding citation and notice of assessment issued by the <br /> department of labor and industries or through a civil judgment entered by a <br /> court of limited or general jurisdiction to have willfully violated, as defined <br /> in RCW 49.48.082, any provision of chapter 49.46, 49.48, or3149.52 RCW. <br /> ' (Note to Bidder: prior to award,the lowest responsive and responsible <br /> bidder must sign the "Certification of Compliance with Wage Payment <br /> Statutes" included in the bid package.This certification is NOT required to <br /> ' be submitted with the bid proposal and may be submitted after bid <br /> opening.) <br /> (b) Supplemental Bidder Responsibility Criteria: RCW 39.04.350(2). In addition to <br /> the mandatory bidder responsibility criteria above,the Bidder must also meet the <br /> supplemental bidder responsibility criteria listed below. Further, the apparent <br /> low Bidder and the second apparent low Bidder must submit the Bidder's <br /> Qualifications Statement(Section 004513) and any other documentation listed <br /> below to the City Clerk within 2 business days after the bid opening, unless the <br /> City's project manager in writing allows additional time. The City reserves the <br /> right to require such documentation from other bidders also. <br /> 1. Proiect-Specific Requirements: <br /> a. Criteria: <br /> (i) Requirements for Field Sub-Grade Establishment <br /> Subcontractor. The Subcontractor listed in Part B of <br /> Section 004336 (Proposed Subcontractors Form) as the <br /> "Field Sub-Grade Establishment" Subcontractor must <br /> ' satisfy both of the following requirements: <br /> (1) For at least the five (5) years prior to Bid opening, <br /> ' the Field Sub-Grade Subcontractor must have been <br /> in the business of actively and directly constructing <br /> sub-grade portions of natural or synthetic field <br /> 1 subgrades with its own forces. <br /> (2) Within the three (3) years prior to Bid opening, <br /> I the Field Sub-Grade Subcontractor must have <br /> Phil Johnson Ballfields Renovation 5 of 12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.