Laserfiche WebLink
i <br /> 1 <br /> RCW: Means the Revised Code of Washington. <br /> Samples: Physical examples of materials,Equipment,or workmanship that are representative of some <br /> portion of the Work and which establish the standards by which such portion of the Work will be judged. <br /> Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of <br /> Values. I <br /> Shall: Required conduct. <br /> Shop Drawings: All drawings,diagrams, illustrations,schedules,and other data or information, which <br /> are specifically prepared or assembled by or for Contractor and submitted by Contractor,to illustrate <br /> some portion of the Work. <br /> Shown: Refers to information presented on the Drawings,with or without reference to the Drawings. 111Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br /> Work is to be performed,including rights-of-way and easements for access thereto,and such other lands <br /> furnished by Owner that are designated for the use of Contractor. <br /> Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br /> features of materials,Equipment,construction systems, standards, and workmanship. <br /> Specify: Refers to information described,shown,noted or presented in any manner in any part of the <br /> Contract Documents. <br /> Subcontractor: An individual or entity having a direct contract with Contractor or with any other <br /> Subcontractor for the performance of a part of the Work. I <br /> Submittals: The information required by the Contract Documents provided by Contractor to the <br /> Owner's Representative or Owner. <br /> Substantial Completion: The day on which the Owner or Owner's Representative determines the <br /> Owner has full and unrestricted use and benefit of the Project, from both the operational and safety <br /> standpoints and only minor incidental Work,replacement of temporary substitute facilities,or minor <br /> correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely111 <br /> at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br /> Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> Supplier: A manufacturer, fabricator, supplier,distributor,materialman,or vendor having a direct <br /> contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br /> in the Work. <br /> Total Float: The amount of time any given activity or path of activities may be delayed before it will <br /> affect the Completion Date. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians,bicyclists,wheelchairs,and <br /> 111 <br /> equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings, or both, due to any reason <br /> whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the bid form. , <br /> Work: Refers to the Project and the labor,materials, Equipment, supplies, services,and other items <br /> necessary for the execution,completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS I <br /> The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> General Conditions—007200-4 <br /> 1 <br />