My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 For concrete pavement removal, a second vertical full depth relief saw cut offset 12 to 18 <br /> 2 inches from and parallel to the initial saw cut is also required, unless the Engineer allows <br /> 3 otherwise. <br /> 4 <br /> 5 Section 2-09, Structure Excavation <br /> 6 April 2, 2018 <br /> I7 2-09.2 Materials <br /> 8 In the first paragraph, the references to "Portland Cement" and "Aggregates for Portland <br /> 9 Cement Concrete" are revised to read: <br /> 110 <br /> 11 Cement 9-01 <br /> 12 Fine Aggregate for Concrete 9-03.1(2) <br /> 1 13 <br /> 14 2-09.3(3)D Shoring and Cofferdams <br /> 15 The first sentence of the sixth paragraph is revised to read: <br /> I16 <br /> 17 Structural shoring and cofferdams shall be designed for conditions stated in this Section <br /> 18 using methods shown in Division I Section 5 of the AASHTO Standard Specifications for <br /> ▪ 19 Highway Bridges Seventeenth Edition — 2002 for allowable stress design, or the AASHTO <br /> 20 LRFD Bridge Design Specifications for load and resistance factor design. <br /> 21 <br /> 11122 Section 3-01, Production from Quarry and Pit Sites <br /> 23 April 2, 2018 <br /> 24 3-01.1 Description <br /> 25 The first paragraph is revised to read: <br /> ▪ 26 <br /> 27 This Work shall consist of manufacturing and producing crushed and screened aggregates <br /> I28 including pit run aggregates of the kind, quality, and grading specified for use in the <br /> 29 construction of concrete, hot mix asphalt, crushed surfacing, maintenance rock, ballast, <br /> 30 gravel base, gravel backfill, gravel borrow, riprap, and bituminous surface treatments of all <br /> 31 descriptions. <br /> 32 <br /> 33 Section 4-04, Ballast and Crushed Surfacing <br /> 34 April 2, 2018 <br /> I35 4-04.3(5) Shaping and Compaction <br /> 36 This section is supplemented with the following new paragraph: <br /> 37 <br /> I38 When using 100% Recycled Concrete Aggregate, the Contractor may submit a written <br /> 39 request to use a test point evaluation for compaction acceptance testing in lieu of <br /> 40 compacting to 95% of the standard density as determined by the requirements of Section <br /> 41 2-03.3(14)D. The test point evaluation shall be performed in accordance with SOP 738. <br /> 42 <br /> 43 Section 5-01, Cement Concrete Pavement Rehabilitation <br /> I44 January 7, 2019 <br /> 45 5-01.2 Materials <br /> 46 The reference for Concrete Patching Material is revised to read: <br /> 47 <br /> 48 Concrete Patching Material, Grout, and Mortar 9-20.1 <br /> 49 <br /> City of Everett Page AM-11 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.