My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 The Contractor shall submit their TESC Plan (either the adopted plan or new plan) and <br /> 2 implementation schedule as Type 2 Working Drawings. At the request of the Engineer, <br /> 3 updated TESC Plans shall be submitted as Type 1 Working Drawings. <br /> 4 • <br /> 5 8-01.3(1)B Erosion and Sediment Control (ESC) Lead <br /> 6 This section is revised to read: <br /> 7 <br /> 8 The Contractor shall identify the ESC Lead at the preconstruction discussions and in the <br /> 9 TESC Plan. The ESC Lead shall have, for the life of the Contract, a current Certificate of <br /> 10 Training in Construction Site Erosion and Sediment Control from a course approved by the <br /> 11 Washington State Department of Ecology. The ESC Lead must be onsite or on call at all <br /> 12 times throughout construction. The ESC Lead shall be listed on the Emergency Contact <br /> 13 List required under Section 1-05.13(1). <br /> 14 <br /> 15 The ESC Lead shall implement the TESC Plan. Implementation shall include, but is not <br /> 16 limited to: <br /> 17 <br /> 18 1. Installing, adaptively managing, and maintaining temporary erosion and sediment <br /> 19 control BMPs to assure continued performance of their intended function. <br /> 20 Damaged or inadequate BMPs shall be corrected immediately. <br /> 21 <br /> 22 2. Updating the TESC Plan to reflect current field conditions. <br /> 23 <br /> 24 3. Discharge sampling and submitting Discharge Monitoring Reports (DMRs) to the <br /> 25 Washington State Department of Ecology in accordance with the CSWGP. <br /> 26 <br /> 27 4. Develop and maintain the Site Log Book as defined in the CSWGP. When the Site <br /> 28 Log Book or portion thereof is electronically developed, the electronic <br /> 29 documentation must be accessible onsite. As a part of the Site Log Book, the <br /> 30 Contractor shall develop and maintain a tracking table to show that identified <br /> 31 TESC compliance issues are fully resolved within 10 calendar days. The table <br /> 32 shall include the date an issue was identified, a description of how it was resolved, <br /> 33 and the date the issue was fully resolved. <br /> 34 <br /> 35 The ESC Lead shall also inspect all areas disturbed by construction activities, all on-site <br /> 36 erosion and sediment control BMPs, and all stormwater discharge points at least once <br /> 37 every calendar week and within 24-hours of runoff events in which stormwater discharges <br /> 38 from the site. Inspections of temporarily stabilized, inactive sites may be reduced to once <br /> 39 every calendar month. The Washington State Department of Ecology's Erosion and <br /> 40 Sediment Control Site Inspection Form, located at https://ecology.wa.gov/Regulations- <br /> 41 Permits/Permits-certifications/Stormwater-general-permits/Construction-stormwater-permit, <br /> 42 shall be completed for each inspection and a copy shall be submitted to the Engineer no <br /> 43 later than the end of the next working day following the inspection. <br /> 44 <br /> 45 8-01.3(1)C Water Management <br /> 46 This section is supplemented with the following new subsections: <br /> 47 <br /> i <br /> I <br /> City of Everett Page AM-68 Amendments <br /> Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.