My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jansen Inc 6/10/2019
>
Contracts
>
Capital Contract
>
Jansen Inc 6/10/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 10:31:13 AM
Creation date
7/9/2019 11:12:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
6/10/2019
Council Approval Date
5/29/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553 PW3640 UP3648
Tracking Number
0001861
Total Compensation
$9,577,841.02
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 11/6/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 12/21/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc 3/20/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jansen Inc. 1/16/2021 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
698
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Compost socks are used to disperse flow and sediment. Compost socks shall be installed <br /> 2 as soon as construction will allow but before flow conditions create erosive flows or <br /> 3 discharges from the site. Compost socks shall be installed prior to any mulching or compost <br /> I 4 • placement. <br /> 5 <br /> I6 8-01.3(13) Temporary Curb <br /> 7 The second to last sentence of the second paragraph is revised to read: <br /> 8 <br /> 9 Temporary curbs shall be a minimum of 4 inches in height. <br /> I10 <br /> 11 8-01.3(14) Temporary Pipe Slope Drain <br /> 12 The third and fourth paragraphs are revised to read: <br /> I13 <br /> 14 The pipe fittings shall be water tight and the pipe secured to the slope with metal posts, <br /> 15 wood stakes, sand bags, or as allowed by the Engineer. <br /> 116 <br /> 17 The water shall be discharged to a stabilized conveyance, sediment trap, stormwater pond, <br /> 18 rock splash pad, or vegetated strip, in a manner to prevent erosion and maintain water <br /> I19 quality compliance. <br /> 20 <br /> 21 The last paragraph is deleted. <br /> I 22 <br /> 23 8-01.3(15) Maintenance <br /> 24 This section is revised to read: <br /> I25 <br /> 26 Erosion and sediment control BMPs shall be maintained or adaptively managed as required <br /> 27 by the CSWGP until the Engineer determines they are no longer needed. When <br /> 28 deficiencies in functional performance are identified, the deficiencies shall be rectified <br /> I29 immediately. <br /> 30 <br /> 31 The BMPs shall be inspected on the schedule outlined in Section 8-01.3(1)B for damage <br /> I32 and sediment deposits. Damage to or undercutting of BMPs shall be repaired immediately. <br /> 33 <br /> 34 In areas where the Contractor's activities have compromised the erosion control functions <br /> 35 of the existing grasses, the Contractor shall overseed at no additional cost to the <br /> 36 Contracting Agency. <br /> 37 <br /> 38 The quarry spalls of construction entrances shall be refreshed, replaced, or screened to <br /> 11 39 maintain voids between the spalls for collecting mud and dirt. <br /> 40 <br /> I41 Unless otherwise specified, when the depth of accumulated sediment and debris reaches <br /> 42 approximately 1/3 the height of the BMP the deposits shall be removed. Debris or <br /> 43 contaminated sediment shall be disposed of in accordance with Section 2-03.3(7)C. Clean <br /> 44 sediments may be stabilized on-site using BMPs as allowed by the Engineer. <br /> I45 <br /> 46 8-01.3(16) Removal <br /> 47 This section is revised to read: <br /> I48 <br /> 49 The Contractor shall remove all temporary BMPs, all associated hardware and associated <br /> 50 accumulated sediment deposition from the project limits prior to Physical Completion <br /> I <br /> City of Everett Page AM-73 Amendments <br /> 1 Everett Downtown Streetscape Improvement March 22, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.