My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 35 <br /> 2019 Biosolids Removal UT3705-2 <br /> 9.5.3 Unabsorbed and Extended Overhead <br /> Any Extended or Unabsorbed Overhead to which the Contractor may be entitled shall be calculated using <br /> the Eichleay formula by: <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. This is <br /> accomplished by multiplying Overhead costs by the ratio of the subject project's billings to the <br /> ' Contractor's overall billings during the overall period of the subject Project's performance. The <br /> result is"Allocable Overhead." <br /> ' a. Any additional and unresolved direct cost claims presented by the Contractor concurrently <br /> with any request for Extended and/or Unabsorbed Overhead shall not be included in <br /> determining the ratio of the subject Project billings to overall Contractor billings for the <br /> period of project performance. <br /> ' 2. Determining the daily amount of Allocable Overhead for the subject Project. This is <br /> accomplished by dividing the Allocable Overhead for the subject Project by the number of days <br /> (as contractually defined)of Contract performance. The result is the Daily Rate of Allocable <br /> Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home Office Overhead <br /> ' due to the project extension. This is accomplished by multiplying the Daily Rate of Allocable <br /> Overhead by the number of days of project extension caused solely by the Owner. This results in <br /> the Gross Amount of Additional Home Office Overhead Compensation. <br /> ' 4. Adjusting the Gross Amount of Additional Home Office Overhead Compensation for any <br /> additional contribution for Overhead received by the Contractor on any Change Orders that are <br /> being presented and resolved concurrently with the subject calculation for Unabsorbed and/or <br /> Extended Home Office Overhead. The necessary adjustment would be to reduce the Gross <br /> ' Amount of Additional Home Office Overhead Compensation by any additional compensation for <br /> Overhead included in any direct cost claims being resolved concurrently with any claim for <br /> ' Extended and/or Unabsorbed Home Office Overhead. <br /> Contractor shall not receive compensation for cost of use of equity capital. <br /> 9.6. FORCE ACCOUNT <br /> If Work or materials are to be paid for by Force Account,payment amounts will be determined and <br /> Contractor shall contemporaneously prepare, keep and maintain records segregated and allocated by time, <br /> ' location and item of Work in compliance with this subsection. Such records must be contemporaneously <br /> countersigned by the Owner or the Owner's Representative(or its designee). Any records not <br /> countersigned by the Owner or Owner's Representative shall be excluded from the calculation of payment <br /> under this subsection. <br /> The payments provided for herein shall be full payment for all Work done on a Force Account basis. The <br /> payment shall be deemed to cover all expenses of every nature, kind, and description, including all <br /> Overhead expenses,profit, occupational tax and any other Federal or State revenue acts,premiums on <br /> ' public liability and property damage insurance policies, and for the use of small tools and equipment for <br /> which no rental is allowed. <br /> No Contract Claim for Force Account shall be allowed except upon written order by the Owner's <br /> Representative for Extra Work prior to the performance of the Extra Work.No Extra Work shall be <br /> construed as Force Account Work that can be measured under the Specifications and paid for at the unit <br /> prices or lump sum named in the Contract. <br /> The Owner's Representative shall compute the amount and costs of any Work to be paid by Force <br /> Account, and the amount certified by the Owner's Representative shall be final as provided in 3.2. <br /> OWNER'S REPRESENTATIVE. <br /> 00 7200 - 35 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.