My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 36 ' <br /> 2019 Biosolids Removal UT3705-2 <br /> The Contractor's wage,payroll, and cost records pertaining to Work paid for on a Force Account basis <br /> shall be open to inspection or audit as provided in ARTICLE 17.AUDITS. <br /> 9.6.1 Labor. , <br /> The Owner will reimburse the Contractor for labor and for supervision by foremen dedicated solely to the <br /> particular Force Account item of Work, but not for supervision by general superintendents or general <br /> foremen. The Owner's Representative will compute the labor payment on the basis of these four factors: <br /> 1. Weighted Wage Rate. The Weighted Wage Rate combines: <br /> a. the current basic wage and fringe benefits the Contractor is required and has agreed to pay, <br /> b. Federal Insurance Compensation(FICA), <br /> c. Federal Unemployment Tax Act(FUTA), and <br /> d. State Unemployment Tax Act(SUTA) <br /> A Weighted Wage Rate shall be computed for each classification of labor used. This rate shall <br /> reflect the Contractor's actual cost. It shall neither exceed what is normally paid to comparable <br /> labor nor fall below the minimum required by 7.1.WAGES OF EMPLOYEES.If the Owner's <br /> Representative authorizes overtime,the Weighted Wage Rate shall be determined on the same <br /> basis. <br /> 2. Travel Allowance and Subsistence. This includes the actual costs of allowances for travel or <br /> subsistence paid to employees in the course of their work on the item. This reimbursement will be <br /> made only if such allowances are required by a regional labor agreement or are normally paid by <br /> the Contractor to comparable labor for performing other work. <br /> 3. Industrial Insurance and Medical Aid Premiums. The Owner will reimburse Contractor-paid <br /> premiums for Marine Industrial Insurance, for State of Washington Industrial Insurance, and ' <br /> Medical Aid Premiums that become an obligation of the Contractor and are chargeable to the <br /> Force Account Work. The Owner will not pay the Contractor for Medical Aid premiums that are <br /> paid by the employees. ' <br /> 4. Overhead and Profit. The Owner will pay the Contractor twenty-nine(29)percent of the sum of <br /> the costs listed in a,b, and c above to cover Project Overhead, general company Overhead, profit, <br /> and any other costs incurred. ' <br /> 9.6.2. Materials. <br /> The Owner will reimburse actual invoice cost for Contractor-supplied materials. This cost includes actual <br /> freight and express charges and taxes,provided that these costs have not been paid in some other manner <br /> under the Contract. A deduction will be made for any offered or available discounts or rebates if the <br /> Owner has provided the Contractor with the means to comply with the provisions allowing the discount. <br /> The Owner will then add twenty-one(21)percent of the balance to cover Project overhead, general <br /> company Overhead, profit, and any other cost of supplying materials. <br /> To support charges for materials,the Contractor shall provide the Owner's Representative with authentic, <br /> complete and accurate copies of vendor invoices, including freight and express bills. If invoices are not <br /> available for materials from the Contractor stocks,the Contractor shall certify actual costs by affidavit. <br /> If Contract Claims for materials costs are too high, inappropriate, or unsupported by satisfactory <br /> evidence,the Owner's Representative may determine the cost for all or part of the materials. When <br /> determined in this manner,the cost will be the lowest current wholesale price from a source that can <br /> supply the required quantity, including delivery costs. <br /> The Owner reserves the right to provide materials. If so,the Contractor will receive no payment for any <br /> costs, Overhead, or profit on such materials. <br /> 00 7200 - 36 GENERAL CONDITIONS ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.