Laserfiche WebLink
City of Everett 00 7300 - 3 <br /> 2019 Biosolids Removal UT3705-2 <br /> F. WORKING HOURS <br /> 1. General Contractor will be required to provide a project schedule that clearly <br /> defines each phase of work and the work hours associated with each phase. <br /> 2. Work site is available from 0600-1730 seven days a week excluding City observed <br /> holidays unless otherwise approved by the City's Project Manager. Any additional <br /> or alternate work hours will require advance approval and coordination with the <br /> City's Project Manager. <br /> 3. The Water Pollution Control Facility (WPCF) will be occupied 24/7 and access to <br /> the work area must be available to plant staff during the project. The Contractor <br /> will have access to the WPCF treatment lagoons necessary to perform the Work. <br /> Contractor will not be permitted access to buildings or other treatment facilities <br /> within the WPCF boundary unless required as a part of the Work. <br /> G. NOISE ORDINANCES <br /> 1. The City has established regulations for control of noise in residential zoned <br /> property. For the purpose of regulating potential disruptive or annoying noise, <br /> Ordinance No. 1556-89 states that all residential zoned land fall within Noise <br /> Control District No. 1. <br /> 2. Residential properties lie within close proximity to the Project site, and noise <br /> generated at the WPCF impacted residential zoned properties in the past. <br /> Therefore. it should be noted that under the City's Noise Ordinance, construction <br /> related noise is limited to the following hours: <br /> 7:00 AM to 10:00 PM on weekdays <br /> ' 8:00 AM to 6:00 PM on weekends and state recognized holidays <br /> 3. No noise variance will be issued to operate outside of these hours. Contractor shall <br /> ensure all Project activities occur during the above hours. <br /> 4. Be aware that all construction sites will be monitored and violators are subject to <br /> ifines. <br /> 5. Construction contractors are responsible for notifying subcontractors of the City's <br /> noise regulations. <br /> 6. All requests for workinghours other than those stated above shall be made <br /> q <br /> exclusively through the City's Representative. <br /> H. CITY OCCUPATION AND OPERATION <br /> I1. The City intends to operate all treatment lagoons during the project. Contractor is <br /> expected to coordinate with City to avoid disruption to ongoing wastewater <br /> treatment processes. <br /> ' 2. Contractor will be responsible for locking the gated entrances to the biosolids pad <br /> and aeration cells outside of working hours. City will not accept liability for <br /> damages, vandalism, theft, or other loss due to failure of Contractor to maintain <br /> site security. <br /> 3. The Contractor shall coordinate with City in scheduling operations to minimize <br /> conflict with concurrent construction projects, plant operations and maintenance <br /> activities. <br /> 00 7300 - 3 SPECIAL CONDITIONS <br /> I <br />