My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3529 - 3 <br /> 2019 Biosolids Removal UT3705-2 <br /> 1 the job site, take immediate actions to correct hazard and if needed, stop work until <br /> hazards have been corrected. <br /> B. The Contractor shall authorize the Health and Safety Representative to resolve safety- <br /> related issues raised by the City. <br /> C. The Health and Safety Representative is responsible to insure that work is performed in <br /> accordance with the Health and Safety Plan. <br /> D. At the daily job briefing and/or tailgate conference, Contractor shall provide the City's <br /> representative in attendance at the meeting all relevant information on the Work to be <br /> performed, its location, and the equipment to be used. <br /> 1 E. The Contractor is responsible to insure that its workers and subcontractors have all <br /> safety equipment required for the Work. <br /> F. Nothing in this Contract shall be construed as imposing any duty upon the City or any of <br /> its employees with regard to, or as constituting any express or implied assumption of <br /> control or responsibility over, Project Site safety, or over any other safety conditions <br /> relating to employees or agents of Contractor or any of its Subcontractors, or the public. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 3529 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 01 3529 - 3 HEALTH AND SAFETY <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.