My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 7/9/2019
>
Contracts
>
Capital Contract
>
American Process Group Inc 7/9/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:38:00 AM
Creation date
7/11/2019 9:36:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
7/9/2019
Council Approval Date
6/5/2019
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0001872
Total Compensation
$611,408.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 -23 <br /> 2019 Biosolids Removal UT3705-2 <br /> the Work in order to prepare a change proposal or in anticipation of approval of a change proposal; adjust <br /> or change the project schedule or take any action or fail to do any action that would affect the Completion <br /> ' Date of the Work;take any action or fail to take any action arising out of the Contractor's change <br /> proposal that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br /> 7. LABOR STANDARDS <br /> 7.1. WAGES OF EMPLOYEES <br /> 7.1.1. General <br /> Pursuant to the requirements of Chapter 39.12 RCW,the Contractor and each Subcontractor or other <br /> person doing the whole or any part of Work to be performed under this Contract in the State of <br /> Washington shall pay each employee working in the State of Washington an amount not less than the <br /> general prevailing rate of wage, as specified by the Industrial Statistician of the Department of Labor and <br /> Industries of Washington State,paid in the vicinity of the Work to be performed under this Contract for <br /> the particular grade or occupation of each employee <br /> Any employee whose type of work is not covered by any of the classified wage rates specified by the <br /> Industrial Statistician shall be paid not less than the rate of wage listed for the classification that most <br /> nearly corresponds to the type of work performed. <br /> In case any Dispute arises as to what are the prevailing rates of wages for work of a similar nature that <br /> cannot be adjusted by the parties in interest, including labor and management representatives,the matter <br /> 1 shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of <br /> Washington, and his or her decision therein shall be final and conclusive and binding on all parties <br /> involved in the Dispute. The schedule of prevailing wage rates as determined by the Industrial <br /> Statistician for the locality or localities where this Contract will be performed are by this reference made a <br /> part of this Contract as though fully set forth herein. The Contractor shall be held responsible for <br /> notifying its Subcontractors of these wage requirements. Failure by either the Contractor or any <br /> ' Subcontractors to comply with requirements of Chapter 39.12 RCW will result in delay of payment to the <br /> Contractor and/or imposition of other sanctions as may be available under the law and this Contract. <br /> 7.1.2. Contractor's Responsibility <br /> The Contractor will be held responsible for paying not less than the prevailing wages, including increases <br /> in such wages, over the term of this agreement. It is,therefore, imperative that the Contractor and its <br /> Subcontractors familiarize themselves with the wage rates before submitting bids based upon these <br /> 1 Specifications. <br /> 7.1.3. Federal Labor Requirements <br /> Contractor shall comply with applicable federal laws and regulations relating to workers, safety and labor. <br /> 7.2. PAYMENT CERTIFICATES <br /> The Contractor and each Subcontractor on or before the date of commencement of the Work shall file a <br /> statement of"Intent to Pay" prevailing wages under oath with the Owner and with the Washington State <br /> Department of Labor and Industries certifying the rate of hourly wage including the usual benefits paid <br /> and to be paid each classification of laborers,workmen, or mechanics employed upon the Work by the <br /> ' Contractor or its Subcontractor that shall not be less than the prevailing rate of wage. No payment will be <br /> made to the Contractor prior to the submission of such statements and the issuance by the Industrial <br /> Statistician of said Department of an acknowledgment of approval. Such statement and any supplemental <br /> 1 statements that may be necessary shall be filed in accordance with the practices and procedures required <br /> by the Department of Labor and Industries. Upon the completion of the Work,the Contractor and all of <br /> its Subcontractors shall submit affidavits of wages paid to the Department of Labor and Industries in such <br /> form as may be required by said Department. Payment of the retained percentage will not be made until <br /> j00 7200 - 23 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.