Project: Everett Station Water Intrusion Repairs and Brick Restoration <br /> Change Order No, 1 <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall he changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to,claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest,dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> I or( <br /> d_ .Attest: Approved As to Form: <br /> -.416, <br /> Mayor Pro teth cit) Cle City Attorn <br /> Date. <br /> . Date: fq e 6r7S//7 <br /> Recommended Be: <br /> Construction Project Manager(if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Date: ate:4{ . 111 Date; Date: 23/I, <br /> I I14 20I8-01 3 I vcrot Station Vc Intn.mon Rrritur dnd Hrick Re-totaln n P.,ge 2 <br /> ot 3 <br /> Provided to Pailders ExchangP of WA, In Por usage Condit:ors Agreement see 3.,,ww,crxwa corn - Always vel_f v Scal <br />