Laserfiche WebLink
Project: Fverett Station Water Intrusion Repairs and Brick Restoration <br /> Change Order No. <br /> Change Order Effective Date._ <br /> ------------- <br /> CONTRACTOR <br /> B p re 41e,..3- Date: ISO/ <br /> v, D <br /> ( Officer <br /> of <br /> Exhibit A—Description of Changed Work <br /> Install two Helical Pins to All capstones to secure them to the building: <br /> LABOR: $30,000.00 <br /> MATERIALS: $2,500.00 <br /> EQUIPMENT: $2,500.00 <br /> Replace 3 window paines with moisture in glass <br /> Window Contractor $6.000.00 <br /> EQUIPMENT: $500.00 <br /> ALPINE (labor & mark up) $500.00 <br /> Install Caulk Joint Sealant to entire perimeter of building at wall to sidewalk joint. <br /> LABOR: $4,000.00 <br /> MATERIALS: $550.00 <br /> vtict,swum Water Intru+Ion Repair.and Hnck RestoraIngi Page 3 of) <br /> Provided to Builders Exchange of WA, :no For nsageC dLton.9 Agreement see 1.7.'w hxya nom - Always 7er:fy Scal <br />