My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12011 19TH AVE SE 2019-07-25
>
Address Records
>
19TH AVE SE
>
12011
>
12011 19TH AVE SE 2019-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:21:22 AM
Creation date
7/25/2019 9:21:10 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12011
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12011 19th Avenue SE <br /> Everett,WA 98028 <br /> Project Number:2018-0363 <br /> 6.0 CONCLUSIONS AND RECOMMENDATIONS (continued) <br /> If discovered, all asbestos-containing materials that will be disturbed as a natural part of renovation <br /> and/or demolition are required to be removed and disposed of in accordance with Washington State <br /> regulations. Washington State Department of Labor and Industries and PSCAA require that the <br /> abatement be performed using Certified Asbestos Workers under the direct on-site supervision by a <br /> Certified Asbestos Supervisor. <br /> NVL recommends that an AHERA inspector/project manager be on site at the time of <br /> renovation/demolition to ensure that any potentially asbestos-containing materials uncovered during the <br /> process of renovation/demolition be dealt with properly. <br /> NVL Labs, Inc. is making the following recommendations regarding asbestos: <br /> 1. A copy of this inspection report should be maintained at the project site during the duration of <br /> renovation /demolition. <br /> 2. A copy of this inspection report should be provided to the General Contractor and any Sub <br /> Contractors working on the renovation/demolition project. <br /> 3. The inspection report is not intended to serve as a design /bidding document, or scope of work <br /> prior to renovation/demolition. <br /> 4. Abatement specifications should be prepared by a Hazardous Materials Consulting firm covering <br /> the regulated building materials that will be impacted by the renovations/demolition, and these <br /> specifications should be part of any contract documents prepared for this project. <br /> 5. A licensed asbestos abatement contractor must be utilized to remove any asbestos-containing <br /> materials that will be impacted by the planned renovation/demolition. <br /> 6. A Hazardous Materials Consulting Firm should provide project oversight and air monitoring <br /> during the removal of the asbestos-containing materials. <br /> NVL Laboratories,Inc. <br /> 4708 Aurora Ave N <br /> Seattle,WA 98199 <br /> Phone(206)547-0100•Fax(206)634-1936 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.